E-Document

B.E.S. Columbia Building: Scope additions and ineffective design oversight led to substantially higher project costs (Report 446B) - 10/22/2014

Thursday, August 3, 2023 at 1:43 PM

23/ED/77163

Electronic Attachment

1.3 MB (1,381,438 bytes)

PDF