E-Document

2020 UICMP Annual Report

Underground Injection Control Management Plan (UICMP) Annual Report FY 2019-20 submitted to the DEQ per the 2015 Water Pollution Control Facilities (WPCF) Permit (Permit 2). Includes the 2020 SDMP Annual Report.

Wednesday, March 24, 2021 at 3:53 PM

21/ED/28830

Electronic Attachment

9.3 MB (9,749,955 bytes)

PDF