E-Document

2018 UICMP Annual Report

Underground Injection Control Management Plan (UICMP) Annual Report FY 2017-18 submitted to the DEQ per the 2015 Water Pollution Control Facilities (WPCF) Permit (Permit 2). Includes the 2018 SDMP Annual Report.

Monday, October 28, 2019 at 3:45 PM

19/ED/107723

Electronic Attachment

1.7 MB (1,762,850 bytes)

PDF