Archival Folder

123701

Thursday, December 8, 1966

AF/136651

TITLE: Introduced by Mayor Schrunk : Authorizing the Bureau of Water Works to loan 40 feet of 16-inch extra heavy coated steel pipe and 120 feet of eight-inch extra heavy coated steel pipe to EE Settergren for use in the construction of Vermont Hills reservoir number 5 for a period of 90 days, and declaring an emergency