E-Document

2021 SDMP Annual Report

Underground Injection Control (UIC) Stormwater Discharge Monitoring Plan (SDMP) Annual Report FY 2020-21 submitted to the DEQ per the 2015 Water Pollution Control Facilities (WPCF) Permit (Permit 2). The 2021 SDMP was submitted as part of the 2021 UICMP Annual Report.

Monday, November 1, 2021 at 3:09 PM

21/ED/103980

Electronic Attachment

2.9 MB (3,083,338 bytes)

PDF