E-Document

2019 UICMP Annual Report

Underground Injection Control Management Plan (UICMP) Annual Report FY 2018-19 submitted to the DEQ per the 2015 Water Pollution Control Facilities (WPCF) Permit (Permit 2). Includes the 2019 SDMP Annual Report.

Wednesday, March 24, 2021 at 3:24 PM

21/ED/28826

Electronic Attachment

1.7 MB (1,762,850 bytes)

PDF