E-Box

LU 19-102941 DZ, GW, SWGW – 8” Conduit Installation

Type III Design Review (per Portland Zoning Code 33.851.100.B.1) for the proposed installation of 5,161 lineal feet of High-Density Polyethylene (HDPE) SDR 13.5 Innerduct in new 8-inch conduit along the southern portion of the Ross Island Bridge for the purposes of accommodating fiber optic cable for internet and communication services. The 8-inch conduit will begin just west of SW Naito Parkway connecting from proposed pipe approved under a Portland Bureau of Transportation (PBOT) Permit and continue east across the bridge where it connects to existing pipe near SE McLoughlin Boulevard.

Friday, March 22, 2019 at 10:45 AM

19/EB/51

Contained Records