E-Document

2016 UICMP Annual Report

Underground Injection Control Management Plan (UICMP) Annual Report FY 2015-16 submitted to the DEQ per the 2015 Water Pollution Control Facilities (WPCF) Permit (Permit 2). The 2016 SDMP Annual Report was included with this submittal.

Monday, October 31, 2016 at 11:20:34 AM

17/ED/63762

Electronic Attachment

205.3 KB (210,275 bytes)

PDF