WWIP, Project # 6904, Influent High Flow Pumps (Flygt), Sump Pumps w/Parts, Hydraulic Parts, High Flow Pumps Performance Curve, Balancing Report |
F/3546613 |
04/30/2005 |
|
|
|
WWIP, Project # 5499, PLC, VFD’s, Gas Detectors, Appendix A Inverness Valve Vault I/O Control Narrative |
F/3546612 |
11/30/2000 |
|
|
|
Public Facilities Plan Drainage Element |
F/3546611 |
06/30/1987 |
|
|
|
O&M Manual Secondary Treatment |
F/3546610 |
12/31/1969 |
|
|
|
TUSI, Sludge Cake MCC Upgrade, GS Breaker, Transformer, Panel, Safety Switch, As Built Drawings, Line Metering and Protection System, MCC Renewal Parts |
F/3546609 |
12/31/1992 |
|
|
|
SECL, Project # 10136, Secondary Clarifier #4 & #6 Pier and Drive Replacement |
F/3546608 |
12/31/2011 |
|
|
|
HEAD, Hydrogritter Separator (Wemco), Belts and Sheaves, Solenoid Valves, Electro Motor, Speed Reducer |
F/3546607 |
05/15/1992 |
|
|
|
SIMM, Project # 7250, MCC, Manual Transfer Switch, reduced Voltage Soft Start, Power Monitor, Lighting, Liquid Level control, Gas Detection System, Telemetry System |
F/3546606 |
02/28/2006 |
|
|
|
SIMM, Project # 7250, Valves, Air Vacuum Valve, Backflow Preventer, Pumps, Fans and Fan Curves, Electric Heater, Warranty, VOL I |
F/3546605 |
12/31/2005 |
|
|
|
TCPS, Project # 6540, Electrical Drawings, Circuit Breakers, Circuit Monitor, Push Buttons, Terminal Blocks, Contact Blocks, Meters, Microprocessor Controlled Three Phase Monitor/Relays, MCC, Overload Relays |
F/3546604 |
11/30/2005 |
|
|
|
TCPS, Project # 6540, Submersible Pump ASP50, Ventilator (Cook), Hoist (Coffin), Hoist Load Test, Air System Testing and Balancing. Fan Data Plate and Performance Curves, VOL 1 of 3 |
F/3546603 |
02/28/2006 |
|
|
|
TCPS, Project # 6540, Flow Switch/Monitor, XE Gas Monitor, VOL 2 |
F/3546602 |
11/30/2005 |