|
|
|
Underside of Incinerator Bridge |
APF/6435 |
07/17/1963 |
|
|
|
Spring St pedestrian bridge and roads in Linnton |
APF/6410 |
11/09/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6409 |
08/06/1963 |
|
|
|
Broadway Dr. retaining wall |
APF/6408 |
02/05/1963 |
|
|
|
Spring St. pedestrian bridge |
APF/6407 |
11/21/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6406 |
07/22/1963 |
|
|
|
Broadway Dr. retaining wall |
APF/6405 |
08/27/1963 |
|
|
|
Broadway Dr. retaining wall |
APF/6404 |
03/30/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6402 |
04/03/1962 |
|
|
|
Wall on Lovejoy Viaduct |
APF/6399 |
04/17/1962 |
|
|
|
Construction of the N Swift Blvd pedestrian overpass |
APF/6398 |
02/17/1969 |
|
|
|
Construction of Term 4 Pier 2 |
APF/6397 |
11/13/1964 |
|
|
|
Driveway at 5844 NE 13th |
APF/6299 |
03/14/1975 |
|
|
|
Corner at 2035 NE 41st and Tillamook |
APF/6300 |
03/26/1975 |
|
|
|
Sidewalk at NE 19th and Clackamas |
APF/6301 |
04/10/1975 |