|
|
|
Barbur Blvd drainage tunnel |
03/31/1934 |
|
|
|
SW Barbur Blvd drainage tunnel |
03/31/1934 |
|
|
|
SW Barbur Blvd drainage tunnel |
03/31/1934 |
|
|
|
NE 24th Ave sewer replacement from NE Prescott St to NE Hamblett Ave |
03/20/1934 |
|
|
|
Land use map |
04/01/1934 |
|
|
|
Underground map : N Broadway from N Crosby to N Benton |
04/01/1934 |
|
|
|
Reconstruction of SE Alder St sewer |
03/31/1934 |
|
|
|
Topographic surveys and maps one mile outside city limits |
03/31/1934 |
|
|
|
Grading of SW Terwilliger Blvd |
02/13/1934 |
|
|
|
Amburn Plan |
10/29/2014 at 12:55:31 PM |
|
|
|
A2000-025.631 : Crew graveling NE 22nd Ave north of Ainsworth |
01/10/1934 |
|
|
|
A2000-025.628 : Gravel path on SW Montgomery Dr |
01/10/1934 |
|
|
|
A2000-025.627 : Gravel path on SW Canyon Rd |
01/10/1934 |
|
|
|
A2000-025.632 : Trenches and fences for sewer repair on NE 24th ave and Prescott |
01/05/1934 |
|
|
|
A2000-025.633 : Crew constructing new sewer on NE 24th ave and Alameda |
01/05/1934 |