|
|
|
Submergerd pipe repair at SE Stephens |
09/15/1909 |
|
|
|
Construction of the Reservoir 6 gatehouse |
02/08/1911 |
|
|
|
Leveling ground at Reservoir 6 |
03/14/1911 |
|
|
|
Reservoir 6 during the Winter |
02/08/1911 |
|
|
|
Mt. Tabor during reservoir construction |
12/31/1910 |
|
|
|
The Powell Butte Reservoir construction site |
09/28/1979 |
|
|
|
Hills around the Powell Butte reservoir |
09/28/1979 |
|
|
|
Powell Butte reservoir construction site |
09/28/1979 |
|
|
|
Powell Butte Reservoir PVRWD pipes |
09/28/1979 |
|
|
|
Powell Butte reservoir columns and wall forms |
09/28/1979 |
|
|
|
Powell Butte reservoir East and West basin |
09/19/1979 |
|
|
|
Outlet structures at the Johnson Creek |
09/28/1979 |
|
|
|
The Gun Club property at Circle Ave. |
09/28/1979 |
|
|
|
Powell Butte reservoir drain line near circle Ave. |
09/28/1979 |
|
|
|
Powell Butte reservoir inlet and outlet pipe |
09/28/1979 |