|
|
|
Sewage pump at Bull Run dam |
12/31/1930 |
|
|
|
Clear cuts and camp sites |
05/03/1927 |
|
|
|
Dam 1 construction |
12/04/1928 |
|
|
|
Dam 1 apron excavation |
06/23/1928 |
|
|
|
Dam 1 spillway in use |
02/01/1930 |
|
|
|
Dam 1 spillway test |
12/11/1926 |
|
|
|
Dam 1 spillway and Lake Ben Morrow |
12/31/1940 |
|
|
|
Shores of Lake Ben Morrow and Beat Creak |
12/31/1940 |
|
|
|
Grating and penstock construction at Dam 1 |
03/02/1928 |
|
|
|
South sidewall river bed construction at Dam 1 |
06/20/1927 |
|
|
|
Transit mall main break at 6th Ave. and Stark St. flooded streets |
06/30/1976 |
|
|
|
Transit mall main break 6th Ave. and Stark St. |
06/30/1976 |
|
|
|
Transit mall main break at 6th Ave. and Stark St.- construction work |
07/02/1976 |
|
|
|
The cracked main from 6th Ave. and Stark St. |
07/02/1976 |
|
|
|
Vernon Reinforcement main at 57th and Prescott St. |
05/28/1916 |