|
|
|
Track plan : Bus routes and time zones |
12/31/1932 |
|
|
|
Streetcar Considerations in Street Construction |
12/31/1927 |
|
|
|
Track plan - bus routes and time zones |
12/31/1932 |
|
|
|
Residential houses |
12/31/1932 |
|
|
|
Map of area near Macadam Ave |
12/31/1925 |
|
|
|
Proposed interconnection of West side electric lines |
12/31/1925 |
|
|
|
Drawing of west side approach to the Ross Island Bridge |
12/31/1925 |
|
|
|
Proposed drawings of Subway specifications |
12/31/1925 |
|
|
|
Proposed drawings of Subway specifications |
12/31/1925 |
|
|
|
Proposed drawings of street widths |
12/31/1925 |
|
|
|
Halsey St Viaduct : Elimination of grade crossings |
12/31/1915 |
|
|
|
Land Use : Between SE Tacoma St and SE Spokane |
12/31/1932 |
|
|
|
Street corner with upholstery business |
12/31/1932 |
|
|
|
Utility pipeline installation |
12/31/1923 |
|
|
|
Proposed 4th St Highway to the Tualatin Valley |
12/31/1930 |