|
|
|
B178 - North Vancouver Avenue over Columbia Slough; Load Rating Report |
10/29/2012 |
|
|
|
B183 - Elrod Slough, Northeast 21st Avenue Bridge; Load Rating Report |
01/03/2014 |
|
|
|
West Moreland Phase 2 |
04/11/2013 |
|
|
|
Manholes – Large Precast Designs; 60”, 72”, 84”, 96” Diameters, Manhole Design Correspondence with Pacific Northwest Concrete Pipe Association, Ramsey Lake Storm Trunk; Manhole Designs; 1996, Precast Manhole Designs |
05/01/1984 |
|
|
|
Monolithic Cast in Concrete Manhole Structures |
04/09/1973 |
|
|
|
Concrete Pipe Design Methods |
07/01/1978 |
|
|
|
North Wheeler Manhole Rehab (120 Precast); February 2003 |
02/01/2003 |
|
|
|
Southwest 45th and Hamilton; Sewer Bridge Structure; Bureau of Environmental Services; May 2004 |
04/06/2005 |
|
|
|
Tanner Phase 3 - Shallow Burial Pipe Topping Slab; June 2006 |
06/16/2006 |
|
|
|
Tri-Met South Corridor Project; Cast in Place Manholes; May 2006 |
05/10/2006 |
|
|
|
Deep Curbs on Southwest Cardinell Drive; Rebar used a tiebacks in roadway slab; 1/4 3228 |
09/18/2009 |
|
|
|
Northwest 10th and Glisan; Report on Vibration Monitoring |
08/28/2006 |
|
|
|
Montgomery Harbor Way |
03/16/2009 |
|
|
|
Northwest Thurman Street; MaCleay Park Bridge Rehab; Contract Documents; September 2013 |
09/01/2013 |
|
|
|
Arlene Schnitzer Concert Hall; Structural Sidewalk Slab; 1/4 3029 |
01/01/2006 |