|
|
|
Tryon Pumping Station Sewer System, Tryon Creek Pump Station 1978 Remodeling Tryon Pumping Station Calculations by R.E.R |
04/01/1965 |
|
|
|
Standards – Book 2, Standard 9x14 Life Stations Calculations by SLB; January 1974 Standard 20 Pump Station Calculations by SLB; September 1973 |
01/01/1974 |
|
|
|
Eastside Combined Sewer Outfall Tunnel Project (Big Pipe) |
05/04/2005 |
|
|
|
Diversion Dam; Southwest 78th Manhole Diversion #6549 |
06/21/1999 |
|
|
|
Southeast 59th Avenue/Southeast Lincoln Street; Revised 60-inch standard manhole (Bureau of Environmental Services) |
01/17/2008 |
|
|
|
Southwest 58th at Hamilton – Box Culvert |
03/04/1999 |
|
|
|
Southwest 53rd and Buddington Street; 30-inch Storm Sewer |
11/03/1995 |
|
|
|
Southeast 28th and Raymond; 120-inch manhole; Wall Steel Only; July 2001 |
06/01/2001 |
|
|
|
Southwest 23rd/ Marigold Storm water Management; Special Local Improvement District Submittal; March 2004 |
02/25/2004 |
|
|
|
Silver Bridge Compost Facility Cover Grating Design; June 1997 |
06/01/1997 |
|
|
|
Sewer System Sullivan Pump Station, Repair of Force Main – Sullivan’s Gulch Pumping Station; May 1974, Sullivan’s Gulch Pump Station; Estimate for Bridging Pressure Line |
05/01/1974 |
|
|
|
Sullivan’s Gulch Pump Station; 1978 Remodeling |
03/01/1988 |
|
|
|
Sullivan Gulch Pump Station; Inlet Baffle Plates |
12/01/1982 |
|
|
|
Sullivan Gulch Sewer Repair (1 of 2) |
07/01/1998 |
|
|
|
Sullivan Gulch Sewer Repair (2 of 2), Sullivan Gulch Sewer Repair Shaft Liner Plate Review; August/September 1997 |
08/01/1997 |