|
|
|
Amburn Plan |
10/29/2014 at 12:55:31 PM |
|
|
|
A2000-025.642 : Crew grading Holgate St east of SE 28th Ave |
06/30/2010 at 2:56:12 PM |
|
|
|
Land use map |
04/01/1934 |
|
|
|
Underground map : N Broadway from N Crosby to N Benton |
04/01/1934 |
|
|
|
Part of land use map prepared under Civil Works Administration Project 55 |
04/01/1934 |
|
|
|
Typical underground map completed under Civil Works Administration (CWA) : N Broadway intersections with Crosby ; Larabee ; and Benton |
04/01/1934 |
|
|
|
A2000-025.604 : Proposed entrance to Portland on NE Sandy Blvd |
03/31/1934 |
|
|
|
A2000-025.603 : View of NE Sandy Blvd |
03/31/1934 |
|
|
|
A2000-025.583 : Relief map of Portland with Amburn scheme insert in place and James and Laurgaard schemes in background |
03/31/1934 |
|
|
|
A2000-025.582 : Relief map of Portland city center with portion of area affected by the three schemes removed |
03/31/1934 |
|
|
|
A2000-025.580 : Map of transportation area tributary to Portland showing transportation routes from roughly Washington state to New Mexico |
03/31/1934 |
|
|
|
A2000-025.581 : Map showing proposed coordinated plan of terminal transportation from N Wheeler St to N Greely Ave |
03/31/1934 |
|
|
|
Reconstruction of SE Alder St sewer |
03/31/1934 |
|
|
|
Topographic surveys and maps one mile outside city limits |
03/31/1934 |
|
|
|
Barbur Blvd drainage tunnel |
03/31/1934 |