|
|
|
A2001-059.77 : Bags of black turtle soup beans, a typical export of the Columbia Basin Project area |
11/30/1965 |
|
|
|
A2001-059.76 : Donald R. McClung : President of Pacific Power & Light, and Dock Commissioner |
11/30/1965 |
|
|
|
A2001-059.75 : Portland harbor and city aerial view |
11/30/1965 |
|
|
|
A2001-059.80 : Men using a mechanical picker to harvest dwarf apples for the Columbia Basin Project |
11/30/1965 |
|
|
|
A2001-059.78 : Japanese combination auto/bulk carrier, OPPAMA MARU, on her maiden voyage to Portland |
11/22/1965 |
|
|
|
A2001-059.79 : Berthing of the MISSISSIPPI at Terminal No. 2, marking the return of French line service to Portland |
11/17/1965 |
|
|
|
A2001-059.74 : SS Norse VARIANT and unloaded Volkswagens |
07/31/1965 |
|
|
|
A2001-059.73 : Variety of foreign auto imports shown at Terminal No. 1 open storage area awaiting distribution |
07/31/1965 |
|
|
|
A2001-059.72 : Dock Commission whirley cranes and floating crane converge on Japanese log carrier |
07/31/1965 |
|
|
|
A2001-059.71 : 1,017 Volkswagens parked in an open storage area adjacent to Terminal No. 2 awaiting distribution |
07/31/1965 |
|
|
|
A2001-059.70 : A 50-ton mining scoop-mobile being loaded aboard the SS LIONS GATE at Terminal No. 1 |
06/30/1965 |
|
|
|
A2001-059.69 : "Old Salty" (honorary lifetime commissioner of the Portland Public Docks) recipient Marshall N. Dana, holding his framed scroll |
06/30/1965 |
|
|
|
A2001-059.68 : Seaplane, Grumman "Goose" amphibian, landing in Terminal No. 1 |
06/30/1965 |
|
|
|
A2001-059.67 : Aerial view of the area where the Matson modernization program was to take place |
06/30/1965 |
|
|
|
A2001-059.66 : Close-up of straight-line container crane to be installed at Matson facility, Pier 2, Terminal No. 4 |
06/30/1965 |