Title |
Record Date
![]() |
|||
![]() |
Vernon - St Johns Pipe Installation and River Crossing Unit 1 and 2 | 12/31/1975 | ||
![]() |
Washington Park Pump Main | 12/31/1974 | ||
![]() |
Pipe installation | 12/31/1974 | ||
![]() |
Rivergate Tank | 12/31/1974 | ||
![]() |
Portland Heights Construction | 12/31/1973 | ||
![]() |
Repairs to 30 Inch Steel River Crossing Line at Clay St East of Harbor Way | 12/31/1969 | ||
![]() |
Reservoir Tanks | 12/31/1968 | ||
![]() |
Installation of Underwater Pipe Crossing, Willamette River at Sellwood Bridge | 12/31/1962 | ||
![]() |
Installation of East - West Main Supply Line | 12/31/1959 |