|
|
|
Correspondence regarding the fire safety and alarm stystem needs at the Hollywood-East apartments |
12/31/1970 |
|
|
|
Liability insurance held by the Housing Authority of Portland during the construction of the Hollywood-East apartments |
10/15/1970 |
|
|
|
Correspondence regarding the installation of a range hood at the Hollywood-East apartments |
07/13/1970 |
|
|
|
The initial operations engineering survey for the Hollywood-East apartments |
05/25/1970 |
|
|
|
A force account for work done at the Hollywood-East apartments |
05/11/1970 |
|
|
|
Issues and the resolution regarding exterior paint for the Hollywood-East Apartment building |
05/01/1970 |
|
|
|
Memorandum regarding post construction repairs and insurance liability |
02/10/1970 |
|
|
|
Inter office memorandums, and correspondence regarding Housing Authority of Portland meeting |
02/04/1970 |
|
|
|
Damaged equipment reports from during the construction of the Hollywood-East apartments |
12/31/1969 |
|
|
|
The color schedules for the Hollywood-East apartment building |
12/31/1969 |
|
|
|
Correspondence regarding the key cards used for the parking gate at the Hollywood East apartments |
12/08/1969 |
|
|
|
Correspondence between Minden construction and HAP regarding water statements |
12/02/1969 |
|
|
|
Correspondence regarding damage to an Albertsons store from a pile driver used at the Hollywood-East construction site |
11/20/1969 |
|
|
|
Correspondence addressing issues that will delay the completion of the Hollywood-East apartments |
09/25/1969 |
|
|
|
Small drawings for floor plans of the Hollywood-East apartments |
08/31/1969 |