|
|
|
Southeast 59th Avenue/Southeast Lincoln Street; Revised 60-inch standard manhole (Bureau of Environmental Services) |
01/17/2008 |
|
|
|
Eastside Combined Sewer Outfall Tunnel Project (Big Pipe) |
05/04/2005 |
|
|
|
Sullivan Gulch Sewer Repair (3 of 3); January 2005 |
01/01/2005 |
|
|
|
Southwest 23rd/ Marigold Storm water Management; Special Local Improvement District Submittal; March 2004 |
02/25/2004 |
|
|
|
Southeast 28th and Raymond; 120-inch manhole; Wall Steel Only; July 2001 |
06/01/2001 |
|
|
|
North Missouri Avenue Manhole Design |
05/24/2000 |
|
|
|
Northeast 3rd Avenue north of Marine Drive; Concrete Encasement check sewer line |
01/25/2000 |
|
|
|
Tryon Creek Waste Water Treatment Plant – Sludge Loading Rack Modification Plan Review; November 1999 |
10/18/1999 |
|
|
|
Diversion Dam; Southwest 78th Manhole Diversion #6549 |
06/21/1999 |
|
|
|
Tryon Creek Treatment Plant (1 of 2) |
05/01/1999 |
|
|
|
Southwest 58th at Hamilton – Box Culvert |
03/04/1999 |
|
|
|
Pheasant Hollow Detention Pond |
09/14/1998 |
|
|
|
Sullivan Gulch Sewer Repair (1 of 2) |
07/01/1998 |
|
|
|
Ramsey Lake Manhole Calculations |
06/19/1998 |
|
|
|
Northwest 3rd at Northwest 107th – Culvert Repair; Linnton Culvert Repairs |
11/01/1997 |