|
|
|
Council Crest Tunnel Commission and proposed tunnel from Portland to Tualatin Valley |
04/25/1912 |
|
|
|
Proposed Connection of Hillside Linnton Boulevard , Willamette Heights and Macleay Park , through Cornell Road and Stark Street Extension |
12/31/1916 |
|
|
|
Comparative Profiles Showing Grades and Distances : 13th and Burnside to Lovejoy and Cornell via Proposed Stark Street Extension |
12/31/1916 |
|
|
|
Isometric Map of Proposed Stark Street Extension: 13th , Burnside and Stark to Lovejoy and Cornell |
12/31/1916 |
|
|
|
Stark St extension maps |
12/31/1916 |
|
|
|
Milwaukee St and 17th St subway and Southern Pacific Railroad entrance into Portland report |
05/15/1925 |
|
|
|
Proposed Traffic Artery to Tualatin Valley report |
12/31/1925 |
|
|
|
Planning Commission reports and memos on Portland traffic conditions |
12/31/1925 |
|
|
|
Plans , Specifications , and Preliminary Estimate for Front St Intercepting Sewer and Drainage System |
12/31/1925 |
|
|
|
Typical Block "B" Street Extension : Map number 3 |
09/07/1929 |
|
|
|
Proposed extension of "B" Street between Nicolai St and Lovejoy St connecting the Guilds Lake Industrial District with the Broadway Bridge |
09/07/1929 |
|
|
|
B Street extension from Nicolai to Lovejoy St : report and maps |
12/31/1929 |
|
|
|
Correspondence between Planning Commission and officials of other cities : street widening and traffic |
12/31/1931 |
|
|
|
Barbur Blvd zone changes and set back lines |
12/31/1935 |
|
|
|
Correspondence and collected data on street widening |
12/31/1935 |