|
|
|
Fields and houses near the reservoir 5 construction site |
09/12/1909 |
|
|
|
Submergerd pipe repair at SE Stephens |
09/15/1909 |
|
|
|
Pressure hose and a steam shovel at the reservoir 5 construction site |
03/10/1910 |
|
|
|
Leveling ground for reservoir 6 |
04/15/1910 |
|
|
|
Reservoir 5 construction and the railroad track around the basin |
07/13/1910 |
|
|
|
Reservoir 5 construction |
07/14/1910 |
|
|
|
Scaffolding and tracks at reservoir 5 during construction |
07/14/1910 |
|
|
|
Horses plowing ground at Mt. Tabor |
07/23/1910 |
|
|
|
Workers standing near pipes for reservoir 5 |
07/23/1910 |
|
|
|
Construction of the center wall of reservoir 6 |
09/26/1910 |
|
|
|
Inlet/outlet pipes at reservoir 6 |
10/01/1910 |
|
|
|
Scaffolding around the edge of the reservoir 5 basin |
10/28/1910 |
|
|
|
Willamette River conduit crossing pipe number 3 |
11/01/1910 |
|
|
|
Reservoir 5 constrcution |
12/14/1910 |
|
|
|
Conduit at the reservoir 5 construction site |
12/14/1910 |