|
|
|
Pipe mains on rafts at the Willamette river crossing |
10/22/1910 |
|
|
|
Pipe mains on rafts at the Willamette river crossing |
10/22/1910 |
|
|
|
Willamette River conduit crossing construction |
10/25/1910 |
|
|
|
Willamette River conduit crossing construction |
10/25/1910 |
|
|
|
Willamette River conduit crossing construction |
10/27/1910 |
|
|
|
Workers sitting on conduit at the Willamette River Crossing |
10/31/1910 |
|
|
|
Willamette River conduit crossing |
10/31/1910 |
|
|
|
Conduit at the Willamette River Crossing |
10/31/1910 |
|
|
|
Man standing with a 30 inch "sub-pipe" for the Willamette river crossing |
12/31/1910 |
|
|
|
Boats and lumber at the Willamette river crossing work area |
12/31/1910 |
|
|
|
Vernon Reinforcement main at Skidmore St. and E. 28th St., 57th St., and E. 29th St. |
05/28/1916 |
|
|
|
Vernon Reinforcement main at 57th and Prescott St. |
05/28/1916 |
|
|
|
Dam 1 spillway test |
12/11/1926 |
|
|
|
Clear cuts and camp sites |
05/03/1927 |
|
|
|
South sidewall river bed construction at Dam 1 |
06/20/1927 |