Building Equipment, Electrical, Mechanical (Dorr Oliver), Thickener Building #1 |
09/01/1968 |
|
|
|
Septic Tank Sludge Receiving Facility (Tipping Berm), Gardner Shop (Paint Shop), Fueling Facility (Fuel Island) |
01/01/1977 |
|
|
|
Closed Coupled Pump (Cornell), Tryon Creek |
08/18/1977 |
|
|
|
Horizontal Non Clog Pumps (Cornell), Tryon Creek |
08/18/1977 |
|
|
|
Electrical Upgrade (Siemens), Volume 2, DIPU |
02/01/1981 |
|
|
|
Electrical Upgrade (Siemens), Volume 1, DIPU |
02/01/1981 |
|
|
|
Grinder Mod: 30000 Service Manual (Muffin monster), Thickener Building #1 |
08/12/1983 |
|
|
|
Grinder Mod: 30000 (Muffin monsters) Thickener Building #1 |
08/12/1983 |
|
|
|
Sludge Belt Addition, Control System, Volume 4B, SLPR |
11/01/1983 |
|
|
|
Sludge Belt Addition, Control System, Volume 3, SLPR |
11/01/1983 |
|
|
|
Sludge Belt Addition, Control System, Volume 2, SLPR |
11/01/1983 |
|
|
|
Truck/Sludge Loading Complex, Conveyors, Hoppers, Scales, Screw Conveyors, Slide Gates, and Hydraulic Power Units, SLPR, Project: 4617 |
11/01/1993 |
|
|
|
Sludge Collector (Envirex), Wet Weather Primaries (Clarifiers) |
12/16/1993 |