A1999-004.5 : Front Ave [Natio Pkwy] Intercepting Sewer : view showing condition of waterfront prior to construction foot of Salmon St |
04/23/1927 |
|
|
|
A1999-004.14 : Front Ave Intercepting Sewer : view showing planer and carriage with power drills for framing crib timbers |
04/23/1927 |
|
|
|
A1999-004.19 : Front Ave [Naito Pkwy] Intercepting Sewer : view showing start in framing first crib |
04/23/1927 |
|
|
|
A1999-004.15 : Front Ave Intercepting Sewer : view showing timber in moving carriage |
04/30/1927 |
|
|
|
A1999-004.10 : Front Ave Intercepting Sewer : full size tenon in testing machine showing special pulling equipment |
04/30/1927 |
|
|
|
A1999-004.11 : Front Ave Intercepting Sewer : small size tenon in testing machine - members of consulting board supervising tests |
04/30/1927 |
|
|
|
A1999-004.12 : Front Ave Intercepting Sewer : small size tenon after test showing method of failure |
04/30/1927 |
|
|
|
A1999-004.13 : Front Ave Intercepting Sewer : view showing revolving head cutter for framing crib timbers |
04/30/1927 |
|
|
|
A1999-004.41 : Front Ave [Naito Pkwy] Intercepting Sewer : view of Bates Dock property before starting pumping plant |
05/05/1927 |
|
|
|
A1999-004.20 : Front Ave [Naito Pkwy] Intercepting Sewer : view showing first crib completed |
05/05/1927 |
|
|
|
A1999-004.21 : Front Ave Intercepting Sewer : pumping plant crib with cofferdam for pumping plant and sewer discharge |
05/31/1927 |
|
|
|
A1999-004.42 : Front Ave Intercepting Sewer : view showing excavation in progress for pumping plant |
05/31/1927 |
|
|
|
A1999-004.16 : Front Ave Intercepting Sewer : view showing close framing of face wall and tenon timbers |
06/06/1927 |
|
|
|
A1999-004.23 : Front Ave [Naito Pkwy] Intercepting Sewer : view showing first crib in position for sinking |
06/09/1927 |
|
|
|
A1999-004.17 : Front Ave Intercepting Sewer : view showing framing of crib splices in longitudinal timbers |