|
|
|
Underground map : N Broadway from N Crosby to N Benton |
04/01/1934 |
|
|
|
Typical underground map completed under Civil Works Administration (CWA) : N Broadway intersections with Crosby ; Larabee ; and Benton |
04/01/1934 |
|
|
|
SW Barbur Blvd drainage tunnel |
03/31/1934 |
|
|
|
SW Barbur Blvd drainage tunnel |
03/31/1934 |
|
|
|
Repair of Maywood Dr retaining wall |
03/22/1934 |
|
|
|
Part of land use map prepared under Civil Works Administration Project 55 |
04/01/1934 |
|
|
|
Land use map |
04/01/1934 |
|
|
|
Amburn Plan |
10/29/2014 at 12:55:31 PM |
|
|
|
A2000-025.652 : Inside view of drainage tunnel beneath SW Barbur Blvd |
02/28/1934 |
|
|
|
A2000-025.651 : Outside view of drainage tunnel beneath SW Barbur Blvd |
02/28/1934 |
|
|
|
A2000-025.650 : Man painting house numbers on SE Elliott Ave |
01/09/1934 |
|
|
|
A2000-025.649 : Crew removing landslide at SW Barbur Blvd |
02/19/1934 |
|
|
|
A2000-025.648 : Gravel path on SE Powell Blvd |
03/20/1934 |
|
|
|
A2000-025.647 : Completed graveling of SE Holgate St |
03/13/1934 |
|
|
|
A2000-025.646 : Completed graveling of SE Holgate St |
03/13/1934 |