|
|
|
White paint back of proposed walk and existing conditions |
05/18/1995 |
|
|
|
Water 37th / Vesta to Dave Hill |
08/08/1997 |
|
|
|
Water 37th / Vesta to Dave Hill |
08/08/1997 |
|
|
|
W. side of Stephenson to Buddington / SW Capitol Hwy / 49th pre construction |
01/16/1996 |
|
|
|
W / S SE Flavel at 52nd construction progress / conditions |
01/05/1998 |
|
|
|
View of W. fence align from prop corner (IR w/YPC) found in bushes along canal |
11/06/1998 |
|
|
|
View of USW vaults in street / curb plus D/W work |
05/08/1997 |
|
|
|
View of S/W excavation S/S Columbia look east from RxR bridge |
03/02/1998 |
|
|
|
View of road SG looking west |
10/20/1997 |
|
|
|
View of removal of unsuitable mat'l from Roadway area |
10/13/1997 |
|
|
|
View of PVC conduits extended into roadway and permit #2488 |
11/30/1998 |
|
|
|
View of original slough bottom sandy mat'l exp. at west of S/S elev. 10.00 ft |
09/18/1997 |
|
|
|
View of forms at NE corner of 102nd and Halsey and sign pole |
08/15/1997 |
|
|
|
View of demo layout 15 / Killingsworth |
08/13/1997 |
|
|
|
View of broken D/W in vehicle turnout area |
10/10/1997 |