|
|
|
Various areas of construction around the Powell Butte reservoir |
10/02/1979 |
|
|
|
Reservoir 6 cleaning basin with pressure hose |
09/12/1975 |
|
|
|
Reservoir 6 cleaning basin with pressure hose |
09/12/1975 |
|
|
|
Reservoir 6 Aerials (SE 60th Ave) |
03/02/1976 |
|
|
|
Reservoir 5 cracks in basin |
11/06/1976 |
|
|
|
Reservoir 5 aerials |
12/31/1940 |
|
|
|
Reservoir 4 Repair preparing subgrade (2521 SW Murray Ave) |
09/27/1976 |
|
|
|
Powell Butte various construction areas |
08/16/1979 |
|
|
|
Powell Butte roads and houses in area |
06/07/1979 |
|
|
|
Powell Butte roads |
04/25/1979 |
|
|
|
Powell butte reservoir working on support columns in basin |
08/29/1979 |
|
|
|
Powell Butte reservoir welding pipes |
09/12/1979 |
|
|
|
Powell Butte reservoir wall construction in basin |
09/05/1979 |
|
|
|
Powell Butte reservoir wall construction |
10/03/1979 |
|
|
|
Powell Butte reservoir wall and pillar support construction |
09/05/1979 |