|
|
|
4th St Extension : Barbur Blvd |
05/01/1933 |
|
|
|
Activities report of the Civic Emergency Committee |
06/15/1931 |
|
|
|
Columbia Slough Channel improvement |
12/31/1935 |
|
|
|
Excerpts from 1931 annual report of Costkeeping Division of Department of Public Works |
12/31/1931 |
|
|
|
Improvement of Willamette Blvd |
08/05/1933 |
|
|
|
Improvement to Swift Blvd and entrances to St Johns incinerator |
08/05/1933 |
|
|
|
Improvment of Lief Erikson Dr / Hillside Blvd |
08/05/1933 |
|
|
|
Widening of East 82nd St |
02/01/1933 |
|
|
|
A2000-025.437 : Men digging trenches on Balch Creek intake for sewer repair by SW Ash St 3rd to 4th |
08/05/1933 |
|
|
|
A2000-025.438 : Men digging trenches on SW Upper Dr near Montgomery Dr for sewer repair by Ash St 3rd to 4th |
08/05/1933 |
|
|
|
A2000-025.439 : Men digging trenches for sewer repair on NE Couch St west of 39th St |
08/05/1933 |
|
|
|
A2000-025.440 : Men working on drains for sewer repair on SW Front and Doane St |
08/05/1933 |
|
|
|
A2000-025.441 : Crew clearing path for road construction on NW Leif Erikson Dr |
12/31/1933 |
|
|
|
A2000-025.442 : Men loading rocks into trucks for road construction on NW Leif Erikson Dr |
08/05/1933 |
|
|
|
A2000-025.443 : Path cleared for road construction on NW Lief Erikson Dr |
08/05/1933 |