Reservoir 6 Cleaning and machinery used in the process |
12/31/1930 |
|
|
|
Reservoir 5 aerial views |
03/02/1976 |
|
|
|
North side of Reservoir 6 |
09/29/1920 |
|
|
|
Resavoir 4 Demolition area and drain pipes (2521 SW Murray Ave) |
09/27/1976 |
|
|
|
Reservoir 4 removing concrete and digging drain line trenches in area 1 (2521 Murray Ave) |
10/01/1976 |
|
|
|
Reservoir 4 area 1 and 2 new concrete |
12/16/1976 |
|
|
|
Reservoir 4 area 2 slabs poured on base of parapet wall |
12/16/1976 |
|
|
|
Reservoir 4 basin |
01/17/1977 |
|
|
|
Reservoir 4 beginning to pour first panel in area 1 |
10/25/1976 |
|
|
|
Reservoir 4 blanketed concrete in area 1 and 2 |
12/01/1976 |
|
|
|
Reservoir 4 Bond beam at toe of slope |
10/05/1976 |
|
|
|
Reservoir 4 compacting subgrade in area 1 |
10/13/1976 |
|
|
|
Reservoir 4 concrete work on basin |
10/15/1976 |
|
|
|
Reservoir 4 Constructing parapet wall |
12/09/1976 |
|
|
|
Reservoir 4 demolition and clearing of old concrete |
10/08/1976 |