AC Unit / Gas Furnace, Control Room, Composter, Project 4014 |
02/29/1984 |
|
|
|
Air Blowers w/Accessories: Archer Pneumatic System, Composter, Project 4014 |
02/29/1984 |
|
|
|
Blower: Roots, Exhaust Fans, Blower Motor, Pressure Relief Valve, Intake Filters Silencers, Plug Valve, Pressure Gauges, In-Line Thermometers, Start Stop Switch, Flow Meter Mod: AF88, Scrubber Strainer, Scrubber O&M, Composter, Project 4014 |
02/29/1984 |
|
|
|
Carbon Unloading Dust Control System, Composter, Project 4014 |
02/29/1984 |
|
|
|
Circulating Sludge Pump: Wemco, Gas Equipment, Crane: Yale, Varec Gas Equipment, Digester |
06/01/1984 |
|
|
|
Conveyor System, Bearings, Belting, Belt Covers, Drives, Electrical, Idlers, Pulleys, Composter, Project 4014 |
02/29/1984 |
|
|
|
Distribution Assembly, Slide Gate Assembly, Hydraulic Power Unit, Composter, Project 4014 |
02/29/1984 |
|
|
|
Drag Chain: Buhler-Miag, Composter, Project 4014 |
02/29/1984 |
|
|
|
Homestead Ballcentric Valve, Actuators: Limittorque, Sludge Processing |
11/17/1983 |
|
|
|
HVAC Control Room, Composter, Project 4014 |
02/29/1984 |
|
|
|
Ladder Programming of Modicon PLC, Composter |
02/29/1984 |
|
|
|
Mixer Sawdust/Sludge: Littleford, Composter, Project 4014 |
02/29/1984 |
|
|
|
Motor Control Center Up-Grade, Component Information, AS Built Drawings, Line Protection, MCC Parts, Warranties, Sludge Processing |
03/17/1993 |
|
|
|
Motor Control Center: Cutler-Hammer, Composter, Project 4014 |
02/29/1984 |
|
|
|
O&M Double Ended Substation, Cutler Hammer, Drawings, Composter |
02/29/1984 |