|
|
|
Airport Way Hearing Study Report |
08/01/1987 |
|
|
|
Analysis: Downtown Parking Plan, Review and Comment on the Downtown Portland Parking Plan |
02/01/1973 |
|
|
|
Barbur Boulevard/Taylors Ferry Road Section Terwilliger Boulevard, and Vermont Street/Barbur Boulevard Section Bertha Boulevard, Hearing Study Report |
11/14/1986 |
|
|
|
Beaverton-Hillsdale Highway Transportation System Management Improvement Project, Addendum Report |
07/08/1981 |
|
|
|
Bicycle Network Inventory, Central City Transportation Management Plan |
09/01/1993 |
|
|
|
Central City Usage Survey, Project Methods and Guide to Computer Data |
07/01/1985 |
|
|
|
Central Hollywood District Urban Design Study |
11/01/1982 |
|
|
|
Cultural Resources Report, Northwest 23rd Avenue and Burnside |
01/01/1984 |
|
|
|
Downtown Parking and Circulation Policy, Air Quality Conclusions |
03/20/1985 |
|
|
|
Downtown Portland Parking Study, Technical Memoranda |
06/08/1973 |
|
|
|
Elements of Vitality, Results of the Downtown Plan |
05/01/1998 |
|
|
|
Final Harbor/Naito Concept Plan with Appendix |
06/01/2004 |
|
|
|
Front Avenue Transportation Study, Technical Memorandum Number 3 on Development of Transyt 7F Traffic Operations Model |
06/01/1987 |
|
|
|
Going Street Noise Mitigation Project, Final Environmental Impact Statement |
07/01/1979 |
|
|
|
Harbor Drive Study |
12/01/1970 |