A1999-004.10 : Front Ave Intercepting Sewer : full size tenon in testing machine showing special pulling equipment |
04/30/1927 |
|
|
|
A1999-004.11 : Front Ave Intercepting Sewer : small size tenon in testing machine - members of consulting board supervising tests |
04/30/1927 |
|
|
|
A1999-004.12 : Front Ave Intercepting Sewer : small size tenon after test showing method of failure |
04/30/1927 |
|
|
|
A1999-004.13 : Front Ave Intercepting Sewer : view showing revolving head cutter for framing crib timbers |
04/30/1927 |
|
|
|
A1999-004.15 : Front Ave Intercepting Sewer : view showing timber in moving carriage |
04/30/1927 |
|
|
|
A1999-004.16 : Front Ave Intercepting Sewer : view showing close framing of face wall and tenon timbers |
06/06/1927 |
|
|
|
A1999-004.17 : Front Ave Intercepting Sewer : view showing framing of crib splices in longitudinal timbers |
06/30/1927 |
|
|
|
A1999-004.18 : Front Ave Intercepting Sewer : view showing framing of cribs placing face wall timber |
06/30/1927 |
|
|
|
A1999-004.21 : Front Ave Intercepting Sewer : pumping plant crib with cofferdam for pumping plant and sewer discharge |
05/31/1927 |
|
|
|
A1999-004.24 : Front Ave Intercepting Sewer : view showing Crib No 11 in position for sinking |
07/05/1927 |
|
|
|
A1999-004.28 : Front Ave Intercepting Sewer : floating concrete plant with gravel bunkers and bulk cement barge |
03/23/1928 |
|
|
|
A1999-004.43 : Front Ave Intercepting Sewer : steel being placed for pump - plant building - concrete seal poured |
09/18/1928 |
|
|
|
A1999-004.45 : Front Ave Intercepting Sewer : pump plant and control building under construction |
12/29/1928 |
|
|
|
A1999-004.46 : Front Ave Intercepting Sewer : pump plant and control building completed |
12/31/1928 |
|
|
|
A1999-004.47 : Front Ave Intercepting Sewer : view of motor - ship Titania in dry dock showing crumpled bow |
02/28/1933 |