|
|
|
Public Relations . .Media Materials Public Outreach Media |
F/4529449 |
01/31/2016 |
|
|
|
Phase II . .Sub-Task 4.2, Bull Run (BR) Dam #3 Site Selection - Evaluation of Potential Sites Supply plan phase II, Task 4.2 |
F/4529448 |
04/19/1995 |
|
|
|
Piezometers . .Logs, Field Notes |
F/4529447 |
01/11/1999 |
|
|
|
2001-3276: Well Site Improvements Wells 35,36, and 37 |
F/4529446 |
03/30/2000 |
|
|
|
Well Head Build-up Calculations for injecting treated drinking water into geological formations at Wells 8, 35, 37 |
F/4529445 |
02/14/2001 |
|
|
|
Water Quality Report |
F/4529444 |
03/01/1991 |
|
|
|
Water Supply Development and Water Quality Constraints Case study of water supply development and water quality constraints by Jeff Leighton |
F/4529443 |
08/01/1996 |
|
|
|
Scoping Paper Scoping issues |
F/4529442 |
08/01/1996 |
|
|
|
Cathodic Protection Vu Mai's calculations, Clevis and electrical box and related hardware |
F/4529441 |
10/31/2012 |
|
|
|
Ground Water ASR (Aquifer Storage and Recovery) Submittals . .Submittals Storage and recovery |
F/4529440 |
05/26/1999 |
|
|
|
Port of Portland Groundwater development program easements |
F/4529439 |
01/05/2007 |
|
|
|
Bull Run . .Groundwater . .Preliminary Flow Modeling Aquifer yield flow model |
F/4529438 |
07/01/2001 |
|
|
|
Powell Valley Road Water District (PVRWD) . .Hydrogeologic Conceptual Model |
F/4529437 |
11/26/2007 |
|
|
|
Pilot . .20CC3 / PW-8 site 4140 NE 185th Pilot wells |
F/4529436 |
01/01/2000 |
|
|
|
Production . .PW-17@ 20800 NE Blue Lake Rd Tracer Study file 2 of 2 |
F/4529435 |
07/28/2001 |