|
|
|
12 feet off Warehouse Floor - Columns Await Epoxy and Momen [Columns] |
13/ED/25889 |
05/23/2000 at 11:49 AM |
|
|
|
Column Boring Operation [Columns] |
13/ED/25890 |
01/12/2000 at 2:33 PM |
|
|
|
Column Boring Operation 2 [Columns] |
13/ED/25891 |
01/12/2000 at 2:33 PM |
|
|
|
Refashioning-finishing Column Tops [Columns] |
13/ED/25892 |
02/01/2000 at 11:21 AM |
|
|
|
PointedSquarePav-Wood Frame [Square Pavilion] |
13/ED/25893 |
03/30/2000 at 11:15 AM |
|
|
|
PointedSquarePav-WoodFrame [Square Pavilion] |
13/ED/25894 |
04/06/2000 at 8:54 AM |
|
|
|
PointedSquarePav-WoodFraming7 [Square Pavilion] |
13/ED/25895 |
03/28/2000 at 10:24 AM |
|
|
|
Wood Frame1 [Square Pavilion] |
13/ED/25896 |
03/30/2000 at 10:16 AM |
|
|
|
4SidedHall-WoodFrameInstallation2 [wood framing] |
13/ED/25897 |
04/06/2000 at 8:53 AM |
|
|
|
4SidedHall-WoodFrameInstalling [wood framing] |
13/ED/25898 |
05/01/2000 at 4:35 PM |
|
|
|
Walkway and Pointed Sq Pavilion Footings [wood framing] |
13/ED/25899 |
03/16/2000 at 2:58 PM |
|
|
|
Bldg detail 2 [construction] |
13/ED/25900 |
04/06/2000 at 8:53 AM |
|
|
|
boathouse9-1-00 [construction] |
13/ED/25901 |
09/05/2000 at 9:55 AM |
|
|
|
ccg-shovel 2 [construction] |
13/ED/25902 |
06/07/1999 at 10:15 AM |
|
|
|
Chipping - Forming Granite Stone Base Close-up [construction] |
13/ED/25903 |
01/12/2000 at 2:33 PM |