|
|
|
Sewer work on NE 24th and Hamblet |
APF/6341 |
05/03/1977 |
|
|
|
Work on the Lovejoy Viaduct |
APF/6345 |
03/29/1962 |
|
|
|
Sewer work at unknown location |
APF/6386 |
08/21/1947 |
|
|
|
Stairs at NE 49th and Wistaria and at Linnton |
APF/6390 |
03/31/1964 |
|
|
|
Unimproved roads and bridges in Linnton |
APF/6391 |
08/13/1962 |
|
|
|
Construction of NW 2nd Street bridge |
APF/6394 |
08/02/1962 |
|
|
|
Linnton stairs |
APF/6396 |
08/06/1964 |
|
|
|
Construction of Term 4 Pier 2 |
APF/6397 |
11/13/1964 |
|
|
|
Construction of the N Swift Blvd pedestrian overpass |
APF/6398 |
02/17/1969 |
|
|
|
Wall on Lovejoy Viaduct |
APF/6399 |
04/17/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6402 |
04/03/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6404 |
03/30/1962 |
|
|
|
Broadway Dr. retaining wall |
APF/6405 |
08/27/1963 |
|
|
|
Broadway Dr. retaining wall |
APF/6406 |
07/22/1963 |
|
|
|
Spring St. pedestrian bridge |
APF/6407 |
11/21/1962 |