Saint Andrews Condominiums
January 8, 2008
Meeting #2
John Reilly
Bill Hawkins
Phil Sydnor
To Discuss:
1 – Cliff
• Stabilization with “shockcrete” with anchoring
• Agreement potentially required by South property owner
2 – Site Adjustments
• Set back adjustments
• Utility pole removal (John is currently discussing with utility co.)
• Street re-grading
• New sidewalk
3 – Define project goals
4 – Define project roles for Client, Architect, & Construction Manager
• Design Phase
• Permitting Phase
• Construction Phase
• Cost Estimating
• Project Coordination
• Value Engineering
5 - Building Design
• Public Amenities
o Small gym
o Sauna
o Group conference room with kitchenette
o ADA accessible parking and apartment units
o 2 parking spaces for 3 units, 3 for penthouse
o Trash chute
o Sound barrier design
o Large individual storage units
• Apartment Amenities
o Large Units – 2,994 gross sq. ft. (elevator and stairs removed)
o Private Foyer directly off of elevator
o Roof terrace and garage roof terrace access
o Views – 180 degree view – west, north, east (mountain & city views)
o Garden room
o Tall ceilings (9’-4” max.)
o Individual interiors as required (classical/ contemporary)
o Large bedrooms
o Large kitchens – with top tier appliances
o Formal Dining Room
o 2.5 baths in 3 units, 3.5 baths in penthouse
o 2 Fireplaces in each unit
o Walk-in closets
• NEXT STEPS
o John and Debra to confirm Public Amenities (see list above)
o John to provide soils report and new survey (new survey to include existing curb heights at both sides of adjacent street and at the adjacent trail
o Bill and Phil to finalize submittal for site adjustment on Thursday, 01/10/08
o Confirm final consultant team – Bill, Phil, and John to explore/ contact other structural engineers. Phil will contact WDY
o Finalize design consultants fee proposal
o John to contact ODOT regarding possible installation of 10’ tall sound barrier wall in the future
o Phil to begin 3d site analysis
o Bill and Phil to finalize preliminary drawing package
o John, Bill, and Phil to research other stone and/or simulated stone paneling/ veneer
• NEXT MEETING
o The next meeting is scheduled for Wednesday, January 16, 2008 at 2 PM at Bill Hawkins office.