Saint Andrews Condominiums

January 3, 2008

 

Meeting #1 –Project Introduction and Initial Structural Design Meeting

 

John Reilly

Bill Hawkins

Phil Sydnor

Greg Vickers – Vickers Nelson Associates

Josh Richards – KPFF

 

•  Preliminary structural design discussion

o  Basement/ First Floor – Concrete Structure

o  Post-tensioned concrete floor slabs

o  Steel framing 2nd floor through 6th floor

o  Shell – 1” thick stone veneer supported with 6” cmu

 

•  Site Conditions to consider

o  Stable Basalt Rock which can be excavated

o  One sided form work on basement level

o  Contact Civil engineer - PSI

 

•  Sound Attenuation

o  Consider triple glazed windows on facade facing highway and windows closer to highway on front and back facades

o  CMU block behind stone will assist in blocking out highway noise

o  Contact “Listen Acoustics” – Toban Cooley

o  Exterior Water features at outdoor areas

o  Tempered Glass on Roof Terrace Parapet Walls

 

•  Architectural

o  Thermal/Moisture – third party consultant/ review?

o  Review stairs for ADA/ Life Safety Compliance (Area of Refuge Requirement)

o  Roof Terrace may be covered pending Penthouse Client

o  Finalize parking layout

o  Phil to finalize preliminary drawing package and begin 3d site analysis

 

•  Mechanical/ Electrical

o  To be Design Build

▪  Oregon Electric

▪  American Heating or ??

 

 

 

•  NEXT STEPS

o  Finalize design consultants fee proposal

o  Project goals

o  Project roles – define Client, Architect, Construction Manager

o  Confirm date and agenda for meeting #2

o  Finalize preliminary drawing package

o  Begin 3d site analysis