Buy American Provisions
Contractor Certification
1. Identification of American-made Iron, Steel, and Manufactured Goods:
Consistent with the terms of the Owner’s Bid solicitation and the provisions of the American
Recovery and Reinvestment Act of 2009 (ARRA 2009) Section 1605, Buy American
Provisions, the Contractor certifies that each and every component of the WORK for which
payment requisition is made reflects the Contractor’s best, good faith effort to identify
domestic sources of iron, steel, and manufactured goods where such American-made
components are available on the schedule and consistent with the deadlines prescribed in or
required by the construction Contract.
2. Verification of U.S. Production: The Contractor further certifies that all components
contained in the WORK that are American-made have been so identified, and will upon the
Owner’s request provide to the Owner reasonable, sufficient, and timely verification to the
Purchaser of the U.S. production of each component so identified.
3. Documentation regarding Non- American-made Iron, Steel, or Manufactured Goods:
The Contractor further certifies that for any components or components that are not
American-made but are submitted to the Engineer for approval in the contract WORK, are so
identified and the Contractor has included in or attached to the submittal to the Engineer one
or both of the following, as applicable:
a. Identification of and citation to a categorical waiver published by the U.S.
Environmental Protection Agency in the Federal Register that is applicable to such
component or components, and an analysis that supports its applicability to the
component or components;
b. Verification documentation sufficient to the OWNER, that the Contractor has sought
to secure American-made component(s) but has determined that such components
are not available on the schedule and consistent with the deadlines prescribed in the
Contract specifications, along with assurance adequate for the Contractor that the
non- American component or components are available on the schedule and
consistent with the Contract deadlines.
4. Information and Detailed Justification Regarding Non- American-made Iron, Steel, or
Manufactured Goods: The Contractor further certifies that for any such component or
components that are not so available, the Contractor has also provided in or attached to this
information, including but not limited to the verifiable documentation and a full description of
the Contractor’s efforts to secure any such American-made component or components, that
the Contractor believes are sufficient to provide and as far as possible constitute the detailed
justification required for a wavier under section 1605 with respect to such component or
components. The Contractor further agrees to assist the OWNER in amending,
supplementing, or further supporting such information as required by the OWNER to request
and, as applicable, implement the terms of a US EPA wavier with respect to any such
component or components.
The Contractor’s “Partial Payment Estimate” shall contain the following certifications for all
projects funded with the American Recovery and Reinvestment Act of 2009 (ARRA 2009)
CONTRACTOR CERTIFICATION
The undersigned certifies that to the best of my knowledge, information and belief, the
WORK covered by this payment estimate has been completed in accordance with the contract
documents including the ARRA 2009 Buy American provisions & Davis Bacon Act requirements,
that all amounts have been paid by the Contractor for WORK for which previous payment
estimates was issued and payments received from the Owner, and that the current payment
shown herein is now due.
Contractor: ____________________________________
By: __________________________________________
Date: _________________________________________
ENGINEER’S CERTIFICATION
The undersigned certifies that the WORK has been carefully inspected and to the best of
my knowledge and belief, the quantities shown in this estimate are correct and the WORK has
been performed in accordance with the contract documents and in compliance with the ARRA
Buy American provisions and Davis Bacon Act.
Engineer: _____________________________________
By: __________________________________________
Date: _________________________________________