A |
B |
C |
D |
E |
F |
G |
H |
I |
---|
1 |
|
Attachment "C" |
|
|
|
|
|
|
|
3 |
|
City of Portland |
Principal 2005 base rate: $62.50 |
|
|
|
4 |
|
Payment Schedule for Woods Street Trunk Sewer Emergency Repair
Project |
Senior Engineer 2005 base rate: $37.16 |
|
|
|
5 |
|
Proposal for Consulting Services 11/10/05 |
Project Engineer 2005 base rate: $32.21 |
|
|
|
6 |
|
Phase 2 Work |
Administrative Personnel 2005 base rate: $18.75 |
|
|
|
7 |
|
Bennett / Staheli Engineers |
Labor Multiplier : 3.01015 |
|
|
|
8 |
|
Phase 2: Rehabilitation/New Installation of I5 Section and upstream
to Manhole ABY728 |
|
|
|
|
|
10 |
Task 1 |
Project Management and Meetings |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
11 |
|
|
Participate in Microtunnel Design Meetings/Presentations (2 in
total) |
10 |
16 |
|
|
|
$3,671.22 |
12 |
|
|
Participate in BES Meetings (3 in total) |
|
24 |
|
|
|
$2,684.88 |
13 |
|
|
Microtunnel pre-construction meeting |
|
4 |
|
|
|
$447.48 |
14 |
|
|
Microtunnel pre-construction workshop |
10 |
10 |
|
|
|
$3,000.00 |
15 |
|
|
Progress Report |
8 |
24 |
|
8 |
|
$4,641.44 |
16 |
|
|
Additional Project Management to Accommodate City Schedule |
8 |
24 |
|
8 |
|
$4,641.44 |
17 |
|
|
|
|
|
Engineering Design Total |
$19,086.46 |
18 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$1,145.19 |
19 |
|
|
|
|
Travel (7 round trips for meetings/workshop) |
$2,100.00 |
20 |
|
|
|
|
|
|
Phase Two Total |
$22,331.65 |
23 |
Task 2 |
Geotechnical Baseline Report |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
24 |
|
|
Assist in Developing Additional Geotechnical Exploration Plan |
|
4 |
|
|
|
$447.48 |
25 |
|
|
Review Geotechnical Information (GDR/GIR) |
4 |
8 |
4 |
|
|
$2,035.32 |
26 |
|
|
Prepare Geotechnical Baseline Report |
32 |
56 |
40 |
16 |
|
$17,066.32 |
27 |
|
|
Finalize Geotechnical Baseline Report during 90% |
12 |
20 |
|
|
|
$4,494.96 |
29 |
|
|
|
|
|
Engineering Design Total |
$24,044.08 |
30 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$1,442.64 |
31 |
|
|
|
|
|
|
Travel |
$- |
32 |
|
|
|
|
|
|
Phase Two Total |
$25,486.72 |
35 |
Task 3 |
30% Engineering Design Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
36 |
|
|
Review Plan and Profiles |
2 |
6 |
|
|
|
$1,047.48 |
37 |
|
|
Update Cost Estimate for Trenchless Components |
2 |
8 |
|
|
|
$1,271.22 |
39 |
|
|
|
|
|
30% Engineering Design Total |
$2,318.70 |
40 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$139.12 |
41 |
|
|
|
|
|
|
Travel |
$- |
42 |
|
|
|
|
|
|
Phase Two Total |
$2,457.82 |
45 |
Task 4 |
60% Engineering Design Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
46 |
|
|
Update Plan and Profiles and Develop Shaft Details |
8 |
16 |
|
|
|
$3,294.96 |
47 |
|
|
CADD Drafting of Microtunneling Design Details |
|
12 |
96 |
|
|
$10,650.60 |
48 |
|
|
Establish Staging Area Requirements |
2 |
6 |
|
|
|
$1,047.48 |
49 |
|
|
Update Cost Estimate for Trenchless Components |
2 |
4 |
|
|
|
$823.74 |
50 |
|
|
Perform Design Calculations (jacking force/lateral earth pressure/settlements/thrust
block) |
16 |
32 |
|
|
|
$6,589.92 |
51 |
|
|
Provide Permitting Support |
4 |
8 |
|
|
|
$1,647.48 |
52 |
|
|
Review Microtunnel Specification |
2 |
8 |
|
|
|
$1,271.22 |
53 |
|
|
Review Jacking Pipe Specification |
2 |
8 |
|
|
|
$1,271.22 |
54 |
|
|
Review Carrier Pipe Specification |
2 |
8 |
|
|
|
$1,271.22 |
55 |
|
|
Review Excavation Support Systems Specification |
2 |
8 |
|
|
|
$1,271.22 |
56 |
|
|
Review/Develop Settlement Monitoring Plan |
6 |
12 |
|
|
|
$2,471.22 |
57 |
|
|
Review Construction Schedule |
2 |
4 |
|
|
|
$823.74 |
59 |
|
|
|
|
|
60% Engineering Design Total |
$32,434.02 |
60 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$1,946.04 |
61 |
|
|
|
|
|
|
Travel |
|
|
|
|
|
|
|
|
|
|
|
---|
62 |
|
|
|
|
|
|
Phase Two Total |
$34,380.06 |
65 |
Task 5 |
90% Engineering Design Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
66 |
|
|
Update Plan and Profiles and Shaft Details |
2 |
6 |
|
|
|
$1,047.48 |
67 |
|
|
Update Design Calculations (jacking force/lateral earth pressure/settlements/thrust
block) |
4 |
12 |
|
|
|
$2,094.96 |
68 |
|
|
Update Microtunnel Specification |
1 |
4 |
|
|
|
$635.61 |
69 |
|
|
Update Jacking Pipe Specification |
1 |
4 |
|
|
|
$635.61 |
70 |
|
|
Update Carrier Pipe Specification |
1 |
4 |
|
|
|
$635.61 |
71 |
|
|
Update Excavation Support Systems Specification |
1 |
4 |
|
|
|
$635.61 |
72 |
|
|
Update Construction Schedule |
|
2 |
|
|
|
$223.74 |
74 |
|
|
|
|
|
90% Engineering Design Total |
$5,908.62 |
75 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$354.52 |
76 |
|
|
|
|
|
|
Travel |
|
77 |
|
|
|
|
|
|
Phase Two Total |
$6,263.14 |
79 |
Task 6 |
Final Engineering Design Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
80 |
|
|
Update Plan and Profiles and Shaft Details |
|
4 |
|
|
|
$447.48 |
81 |
|
|
Update Cost Estimate for Trenchless Components |
|
4 |
|
|
|
$447.48 |
82 |
|
|
Update Microtunnel Specification |
2 |
4 |
|
|
|
$823.74 |
83 |
|
|
Update Jacking Pipe Specification |
2 |
4 |
|
|
|
$823.74 |
84 |
|
|
Update Carrier Pipe Specification |
|
4 |
|
|
|
$447.48 |
85 |
|
|
Update Excavation Support Systems Specification |
|
4 |
|
|
|
$447.48 |
87 |
|
|
|
|
|
Final Engineering Design Total |
$3,437.40 |
88 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$206.24 |
89 |
|
|
|
|
|
|
Travel |
|
90 |
|
|
|
|
|
|
Phase Two Total |
$3,643.64 |
92 |
Task 7 |
Bid Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
93 |
|
|
Prepare Contractor Prequalification Packages |
8 |
12 |
|
|
|
$2,847.48 |
94 |
|
|
Review Contractor Prequalification Packages |
2 |
8 |
|
|
|
$1,271.22 |
95 |
|
|
Advise on Prequalification of Contractors |
2 |
4 |
|
|
|
$823.74 |
96 |
|
|
Attend Pre-bid Meeting |
|
8 |
|
|
|
$894.96 |
97 |
|
|
Respond to RFI's |
2 |
6 |
|
|
|
$1,047.48 |
98 |
|
|
Prepare Addenda |
2 |
6 |
|
|
|
$1,047.48 |
99 |
|
|
Evaluate Bidder Qualifications |
8 |
8 |
|
|
|
$2,400.00 |
100 |
|
|
Advise on Selection/Award |
2 |
6 |
|
|
|
$1,047.48 |
101 |
|
|
Attend Bid Opening |
|
8 |
|
|
|
$894.96 |
103 |
|
|
|
|
|
|
Engineering Total |
$12,274.80 |
104 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$736.49 |
105 |
|
|
|
|
|
Travel (2 roundtrips for bid meetings) |
$600.00 |
106 |
|
|
|
|
|
|
Phase Two Total |
$13,611.29 |
109 |
Task 8 |
Construction Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
110 |
|
|
Evaluate Microtunnel Submittals |
8 |
16 |
|
|
|
$3,294.96 |
111 |
|
|
Respond to RFI's |
4 |
6 |
|
|
|
$1,423.74 |
112 |
|
|
Office Support during Construction |
12 |
32 |
|
|
|
$5,837.40 |
113 |
|
|
Inspector Training (if required) |
|
16 |
|
|
|
$1,789.92 |
115 |
|
|
|
|
|
|
Engineering Total |
$12,346.02 |
116 |
|
|
|
|
|
Other Direct Costs (Estimated at 6%) |
$740.76 |
117 |
|
|
|
|
|
|
Travel |
|
118 |
|
|
|
|
|
|
Phase Two Total |
$13,086.78 |
120 |
Task 9 |
Optional Construction Services |
Principal @ $188.13/hour |
Senior Engineer @ $111.87/hour |
Project Engineer @ $96.96/hour |
Administrative @ $56.44/hour |
|
Sub Total |
121 |
|
|
Resident Engineer |
|
|
|
|
|
|
122 |
|
|
Interstate-5 Drive |
|
|
|
|
|
|