A |
B |
C |
D |
E |
F |
G |
---|
1 |
ITEM |
No. |
ITEMS OF WORK AND MATERIALS |
TOTAL QUANT |
UNIT |
UNIT PRICE |
TOTAL PRICE |
3 |
|
Schedule F - Gibbs Streetcar Extension |
|
|
|
|
4 |
1 |
RFP102328 |
Preconstruction Services |
1 |
LS |
$5,000.00 |
$5,000.00 |
5 |
2 |
Appendix A |
M/W/ESB Coordinator |
1 |
LS |
$15,000.00 |
$15,000.00 |
6 |
3 |
00206 |
Field Engineering |
1 |
LS |
$45,000.00 |
$45,000.00 |
7 |
4 |
00207 |
Quality Control |
1 |
LS |
$60,000.00 |
$60,000.00 |
8 |
5 |
00208 |
Hazardous Material Health and Safety Plan and Report |
1 |
LS |
$3,985.00 |
$3,985.00 |
9 |
6 |
00208 |
Hazardous Material Disposal |
1 |
PS |
$85,000.00 |
$85,000.00 |
10 |
7 |
00210 |
Mobilization |
1 |
LS |
$344,028.00 |
$344,028.00 |
11 |
8 |
00225 |
Work Zone Traffic Control |
1 |
LS |
$100,000.00 |
$100,000.00 |
12 |
9 |
00280 |
Erosion Control |
1 |
LS |
$20,000.00 |
$20,000.00 |
13 |
10 |
00310 |
Remove Existing Railroad Tracks |
1,590 |
TM(F) |
$45.00 |
$71,550.00 |
14 |
11 |
00310 |
Dispose of Existing Timber Ties |
1 |
PS |
$15,000.00 |
$15,000.00 |
15 |
12 |
00310 |
Removal of AC and Concrete Surfacings (100mm thick) |
186 |
M3(F) |
$200.00 |
$37,200.00 |
16 |
13 |
00320 |
Clearing and Grubbing |
1 |
LS |
$25,000.00 |
$25,000.00 |
17 |
14 |
00330 |
Roadway Excavation (reconstruction) |
80 |
M3 |
$65.00 |
$5,200.00 |
18 |
15 |
00330 |
Track Slab Excavation |
108 |
M3(F) |
$63.00 |
$6,804.00 |
19 |
16 |
00330 |
Track Aggregate Base Excavation |
54 |
M3 |
$75.00 |
$4,050.00 |
20 |
17 |
00330 |
Ballasted Trackbed Excavation |
2,000 |
M3(F) |
$38.00 |
$76,000.00 |
21 |
18 |
00330 |
Ballasted Trackbed Embankment |
1,400 |
M3(F) |
$25.00 |
$35,000.00 |
22 |
19 |
00445 |
200mm SDR 35 PVC Track Drain Leads |
15 |
M |
$270.00 |
$4,050.00 |
23 |
20 |
00490 |
Minor Adjustment of Manholes |
1 |
EA |
$500.00 |
$500.00 |
24 |
21 |
00490 |
Adjusting Water Valves |
13 |
EA |
$250.00 |
$3,250.00 |
25 |
22 |
00495 |
Sewer Trench Resurfacing - Asphalt Concrete |
6 |
M2 |
$95.00 |
$570.00 |
26 |
23 |
00620 |
Cold Plane Pavement Removal |
700 |
M2 |
$15.00 |
$10,500.00 |
27 |
24 |
00641 |
Subgrade Stabilization, Trackway, Roadway |
100 |
M3 |
$55.00 |
$5,500.00 |
28 |
25 |
00641 |
Geotextile Fabric |
300 |
M2 |
$3.75 |
$1,125.00 |
29 |
26 |
00641 |
Subballast Placement |
580 |
M3(F) |
$37.00 |
$21,460.00 |
30 |
27 |
00641 |
Subballast (Imported Material) |
1,100 |
Mg |
$17.00 |
$18,700.00 |
31 |
28 |
00641 |
Trackway Aggregate Base |
54 |
M3 |
$85.00 |
$4,590.00 |
32 |
29 |
00641 |
Aggregate Base for Roadway Construction |
50 |
M3 |
$140.00 |
$7,000.00 |
33 |
30 |
00744 |
Asphalt Concrete Pavement |
220 |
Mg |
$116.00 |
$25,520.00 |
34 |
31 |
00757 |
OCS Pole Foundations F1/FF1 |
32 |
EA |
$2,500.00 |
$80,000.00 |
35 |
32 |
00757 |
OCS Pole Foundations F2/FF2 |
3 |
EA |
$3,500.00 |
$10,500.00 |
36 |
33 |
00759 |
Curb Cut Spillway |
13 |
EA |
$700.00 |
$9,100.00 |
37 |
34 |
00759 |
Concrete Curbs (outside of stops) |
297 |
M |
$92.00 |
$27,324.00 |
38 |
35 |
00759 |
Track-side Curbs |
93 |
M |
$140.00 |
$13,020.00 |
39 |
36 |
00759 |
Concrete Walks (outside of stops) |
53 |
M2 |
$62.00 |
$3,286.00 |
40 |
37 |
00759 |
Truncated Dome Detectable Warning |
6 |
M2 |
$300.00 |
$1,800.00 |
41 |
38 |
00759 |
Ballast Wall |
95 |
M (F) |
$180.00 |
$17,100.00 |
42 |
39 |
00762 |
Stop Platform (Gibbs) |
1 |
LS |
$75,000.00 |
$75,000.00 |
43 |
40 |
00861 |
Permanent Pavement Marking & Striping |
1 |
LS |
$15,000.00 |
$15,000.00 |
44 |
41 |
00905 |
Signage |
1 |
LS |
$2,700.00 |
$2,700.00 |
45 |
42 |
00990 |
Traffic Signals, Complete (Sheridan & Moody) |
1 |
LS |
$68,600.00 |
$68,600.00 |
46 |
43 |
01040 |
Landscaping |
1 |
LS |
$26,857.00 |
$26,857.00 |
47 |
44 |
01120 |
Irrigation System Water Service |
1 |
LS |
$6,350.00 |
$6,350.00 |
48 |
45 |
01120 |
Irrigation system |
1 |
LS |
$6,043.00 |
$6,043.00 |
49 |
46 |
01210 |
Install Ri52 Paved Track - Tangent |
94 |
TM(F) |
$793.00 |
$74,542.00 |
50 |
47 |
01210 |
Install Ri52 Paved Track - Curved |
50 |
TM(F) |
$880.00 |
$44,000.00 |
51 |
48 |
01210 |
Furnish and Install Track Drain - Ri52 |
1 |
EA |
$2,200.00 |
$2,200.00 |
|
|
|
|
|
|
|
|
---|
52 |
49 |
01210 |
Install Ri59 to Ri52 Transition Rails |
1 |
PAIR |
$5,500.00 |
$5,500.00 |
53 |
50 |
01260 |
115RE Insulated Rail Joints |
3 |
EA |
$1,500.00 |
$4,500.00 |
54 |
51 |
01260 |
Furnish Concrete Ties |
910 |
EA(F) |
$90.00 |
$81,900.00 |
55 |
52 |
01260 |
Furnish 115RE CWR |
1,390 |
M(F) |
$115.00 |
$159,850.00 |
56 |
53 |
01260 |
Construct Ballasted Track |
654 |
TM(F) |
$325.00 |
$212,550.00 |
57 |
54 |
01260 |
Install Transition Slab to Embedded Track |
1 |
EA |
$3,000.00 |
$3,000.00 |
58 |
55 |
01260 |
Install Road Crossing Rubber Rail Interface |
20 |
TM |
$460.00 |
$9,200.00 |
59 |
56 |
01260 |
Furnish and Install Wheel Stops |
2 |
PAIR |
$600.00 |
$1,200.00 |
60 |
57 |
01270 |
Furnish Refurbished #5 Turnout |
1 |
EA |
$23,000.00 |
$23,000.00 |
61 |
58 |
01270 |
Furnish Powered Switch Mechanism |
1 |
EA |
$25,000.00 |
$25,000.00 |
62 |
59 |
01270 |
Install #5 Turnout Incl. Ties and Switch Mechanism |
1 |
EA |
$62,000.00 |
$62,000.00 |
63 |
60 |
01280 |
Pre-Bend Tangent Rail (Ri52 and 115RE) |
1 |
LS |
$20,000.00 |
$20,000.00 |
64 |
61 |
01310 |
Switch/Rail Bonding |
1 |
LS |
$7,500.00 |
$7,500.00 |
65 |
62 |
01330 |
Ductbank |
1 |
LS |
$121,979.00 |
$121,979.00 |
66 |
63 |
01340 |
SC Manholes |
1 |
LS |
$37,000.00 |
$37,000.00 |
67 |
64 |
01366 |
Moody Train Signal System |
1 |
LS |
$559,509.00 |
$559,509.00 |
68 |
65 |
01390 |
Track Electrical Testing |
1 |
LS |
$12,571.00 |
$12,571.00 |
69 |
66 |
16120 |
Furnish and Install 2kV Feeder Cable, Splices, Termination's,
and Supports |
1 |
LS |
$26,745.00 |
$26,745.00 |
70 |
67 |
16400 |
Furnish Taper Tubular Pole PS1, PH1, PF1 |
24 |
EA |
$2,179.00 |
$52,296.00 |
71 |
68 |
16400 |
Furnish Taper Tubular Pole PS3, PH3, PF3 |
6 |
EA |
$3,383.00 |
$20,298.00 |
72 |
69 |
16400 |
Furnish Taper Tubular Pole PS6, PH6, PF6 |
2 |
EA |
$3,014.00 |
$6,028.00 |
73 |
70 |
16400 |
Furnish Taper Tubular Pole PS9, PH9, PF9 |
3 |
EA |
$4,149.00 |
$12,447.00 |
74 |
71 |
16400 |
Installation and Grounding of Taper Tubular Poles |
35 |
EA |
$959.00 |
$33,565.00 |
75 |
72 |
16400 |
Furnish and Install Cantilever Assembly |
35 |
EA |
$3,145.00 |
$110,075.00 |
76 |
73 |
16400 |
Furnish and Install Single Track Cross Span Assembly CS1, CS1A |
1 |
EA |
$10,502.00 |
$10,502.00 |
77 |
74 |
16400 |
Furnish and Install Single Track Pull Off Assembly PO1 |
1 |
EA |
$6,640.00 |
$6,640.00 |
78 |
75 |
16400 |
Furnish and Install Single Track Backbone Assembly BB1 |
1 |
EA |
$8,660.00 |
$8,660.00 |
79 |
76 |
16400 |
Furnish and Install Fixed Termination Assembly FT |
2 |
EA |
$3,472.00 |
$6,944.00 |
80 |
77 |
16400 |
Furnish and Install Single Disconnect Switch Assembly DS1 |
1 |
EA |
$8,857.00 |
$8,857.00 |
81 |
78 |
16400 |
Furnish and Install Fixed Tension Single Contact System |
902 |
TM(F) |
$43.00 |
$38,786.00 |
82 |
79 |
16950 |
Subsation Field Acceptance Testing |
1 |
LS |
$4,399.00 |
$4,399.00 |
83 |
80 |
16950 |
OCS Field Acceptance Testing |
1 |
LS |
$23,243.00 |
$23,243.00 |
84 |
81 |
16950 |
Integrated System Testing |
1 |
LS |
$12,283.00 |
$12,283.00 |
85 |
82 |
16950 |
Documentation Drawings and Manuals |
1 |
LS |
$5,943.00 |
$5,943.00 |
87 |
|
|
Total Schedule F |
|
$3,273,974.00 |
88 |
|
|
CM/GC FEE (3.5%) |
|
$114,589.09 |
90 |
|
|
TOTAL CONSTRUCTION COST |
|
$3,388,563.09 |