B D
1 Lower Albina Overcrossing IGA Amendment  
2   Apr-03
3 Tri-Met Obligations  
4 Tri-Met to Contract with Stacy and Witbeck Inc for construction of Overcrossing. Work consists of:  
6 Const of Bridge & Civil - Mod #9 $ 6,347,062
7 Const of Raising Interstate - Mod #10 $ 2,315,668
8 OCIP Insurance $ 177,891
9 Total Obligation $ 8,840,620
12 Tri-Met Resources  
14 Tri-Met Direct Contribution $ 1,973,467
15 FTA Grant $ 5,314,671
16 PDOT (from LID) $ 1,552,482
17 Total Resources $ 8,840,620
20 City Obligations  
22 UPRR Work (Lump Sum + flagging) $ 645,577
23 Glacier NW Settlement (Lump Sum) $ 145,000
24 Utility Relocations $ 101,483
25 Demo Valvoline Building $ 56,901
26 Tucker Property Improvements $ 60,000
27 ROW Acquisition $ 3,814,676
28 Design Engineering $ 1,567,043
29 PDOT staff (outside IMAX Staff) Construction Admin $ 130,745
30 Water by BWW crews $ 126,941
31 BWW Engineering $ 60,705
32 BES Engineering $ 37,711
33 CH2M Construction Services $ 357,155
34 Misc Consultants $ 180,186
35 DEQ $ 11,336
36 Auditor Fee's $ 18,947
37 Valvoline Assessment $ 6,435
38 Contingency $ 24,868
39 Total Obligation $ 7,345,708
41 City Resources  
42 FHWA Design Grant $ 600,000
43 ODOT Rail Funds $ 600,000
44 UPRR $ 1,065,000
45 SDC $ 2,537,000
46 LID $ 2,222,518
47 BWW for Water Line $ 295,710
48 BES for Sewer $ 25,480
49 Total Resources $ 7,345,708

May 03

  B D
1 Lower Albina Overcrossing IGA Amendment  
2   Feb-03
3 Tri-Met Obligations  
4 Tri-Met to Contract with Stacey Widbeck for construction of Overcrossing. Work consists of:  
6 Const of Bridge & Civil - Mod #9 $6,347,062.08
7 Const of Raising Interstate - Mod #10 $2,486,251.00
8 OCIP Insurance $114,671.00
9 Total Obligation $8,947,984.08
12 Tri-Met Resources  
14 Tri-Met Direct Contribution $1,986,251.00
15 FTA Grant $5,314,671.00
16 PDOT (from LID) $1,647,062.08
17 Total Resources $8,947,984.08
20 City Obligations  
22 UPRR Work (Lump Sum + flagging) $645,576.60
23 Glacier NW Settlement (Lump Sum) $145,000.00
24 Utility Relocations $101,482.79
25 Demo Valvoline Building $56,901.00
26 Tucker Property Improvements  
27 ROW Acquisition $3,814,676.39
28 Design Engineering $1,567,042.70
29 PDOT staff (outside IMAX Staff) Construction Admin $121,239.45
30 Water by BWW crews $126,941.00
31 BWW Engineering $60,705.00
32 BES Engineering $37,711.32
33 CH2M Construction Services $357,154.64
34 Misc Consultants $167,285.76
35 DEQ $11,632.22
36 Auditor Fee's $18,946.50
37 Valvoline Assessment $6,434.95
38 Contingency $12,397.60
39 Total Obligation $7,251,127.92
41 City Resources  
42 FHWA Design Grant $600,000.00
43 ODOT Rail Funds $600,000.00
44 UPRR $1,065,000.00
45 SDC $2,537,000.00
46 LID $2,127,937.92
47 BWW for Water Line $295,710.00
48 BES for Sewer $25,480.00
49 Total Resources $7,251,127.92

Feb 03

  A C E
2 City Obligations    
4 UPRR Work (Lump Sum + flagging) $- done
5 Glacier NW Settlement (Lump Sum) $126,941.00 done
6 Utility Relocations $645,576.60 done
7 Demo Valvoline Building $145,000.00 done
8 ROW Acquisition $3,814,676.39 outstanding Smith Bros Settlement
9 Design Engineering $3,821,111.34 done
10 PDOT staff (outside IMAX Staff) Construction Admin $130,745.19  
11 BWW crews $8,853,379.43 done but not final number yet
12 BWW Engineering (PDOT share) $60,705.00 closeout left but also not final number yet from BWW
13 BES Engineering (PDOT share) $37,711.32 closeout left but also not final number yet from BES
14 CH2M Construction Services $357,154.64 final billings needed including for Ater Wynne
15 Misc Consultants $168,285.76 URS/DEA, Valvoline leftover appraisal
16 DEQ $11,336.07 still working on Tucker and Valvoline
17 Construction Financing   may need some if choose not to assess LID now
18 Auditor's Fees $1,567,042.70  
19 Contingency $-  
20 Total Obligation $19,739,665.44  
22 Minus Pending Obligations    
24 ROW Acquisition $10,000.00 Settlement due January 30 if have not obtained easement from UPRR
25 PDOT staff (outside IMAX Staff) Construction Admin $5,000.00 Closeout, survey monumentation
26 Const Admin M&S $- Closeout estimated
27 BWW Crews $8,799,423.43 Close to Final
28 BWW Engineering $36,666.87 Close to Final
29 BES Engineering $428.00 Closeout estimated
30 CH2M Const Services $54,378.00 As-Built completion, load rating calcs, environmental consultant
31 URS/DEA $116,469.29 Waiting for billings from site work and future analysis - should know more 11/8
32 Valvoline appraisal for sale $4,000.00 Reappraisal of left-over property to sell
33 DEQ $3,500.00 Estimate to complete reviews etc.
34 Construction Financing   Unknown - may need some if choose not to assess LID now
35 Auditor's Fees $1,567,042.70  
36 Contingency $- To cover potential environmental requirements from DEQ
37   $10,596,908.29  

Sheet2

  A B C E F
1 Expended by PDOT to 9/25/02        
3 Total PDOT Expenses $19,739,665.44      
5 Expenses Pending   Based on Budget Karen Comments
6 ROW Acquisition   $10,000.00 $10,000.00 likely
7 PDOT staff (outside IMAX Staff) Construction Admin $5,000.00 $6,700.00 est - may be high
8 Const Admin M&S   $- $400.00 est - may be high
9 BWW Crews   $8,799,423.43 $71,248.14 s.b. close
10 BWW Engineering   $36,666.87 $38,000.00 include closeout
11 BES Engineering   $428.00 $428.00 est - may be low
12 CH2M Const Services   $54,378.00 $54,378.00 s.b. close
13 URS/DEA   $116,469.29 $115,500.00 close
14 Valvoline appraisal for sale   $4,000.00 $4,000.00 est - may be high
15 DEQ   $3,500.00 $3,500.00 est - may be low
16 Construction Financing   $-   gone
17 Auditor's Fees   $1,567,042.70 $16,534.50  
18 LID Assessment   $24,892.66 $6,500.00  
19     $10,621,800.95 $327,188.64  
21 Expenses as of 9/25/2002 $9,117,864.49      
23 City Resources as of 9/25/2002        
24 FHWA Design Grant   $600,000.00    
25 ODOT Rail Funds   $600,000.00    
26 UPRR   $1,065,000.00    
27 SDC   $2,537,000.00    
28     $4,802,000.00    
30 Outstanding Expenses Not Cost Recovered $4,315,864.49      
32 Future Resources to City        
33 LID   #REF! $3.775M minus $1.7M owed to Tri-Met based on $5.150 Fed Grant
34 BWW for Water Line (estimate)   $295,710.00    
35 BES for Sewer (estimate)   $25,480.00    
36     #REF!    
38 Resources to Cover Pending Expenses #REF!      