Asset Identifiers: 15009 _______________________________ Created by & Date: Rick Davis, 8-17-2021 _______________________________ Revised by & Date:
| Facility: Columbia Slough Pump Station | Asset Location: In Wetwell |
Asset Description:
Electric Motor, Pump, # 1, Sewage
|
SYMBOL | ENERGY TYPE | X | MAGNITUDE | SYMBOL | ENERGY TYPE | X | MAGNITUDE | |
Chemical | Electrical | X | 480 V A/C | |||||
Mechanical | Hydraulic | |||||||
Thermal | Pneumatic | |||||||
RF Radiation | Gravitational | |||||||
Check | Lockout Application Process | Check | Lockout Removal Process |
| Notify affected Personnel. |
| Ensure all tools and items have been removed. |
| Properly shut down unit. |
| Confirm all employees are safely located. |
| Isolate all energy sources. |
| Verify controls are in neutral. |
| Apply all lockout devices |
| Remove lockout devices and re-energize the unit. |
| Verify total de-energization of all sources. |
| Notify affected employees servicing is completed. |
# | Energy | Lockout Location | Method | Type of Device |
1 |
| Local Disconnect or MCC | Open disconnect unplug if possible and/or open breaker at MCC | Tree, tag & lock |
2 |
| |||
3 |
| |||
4 |
|