1   City of Portland
2   Office of Planning and Development Review
4   Proposed
5   Site Development Permit Fee Schedule
6   Effective Date: November 15, 2002
13   APPLIES TO COMMERCIAL PROJECTS:
14   On-Site Permanent Stormwater Control Facilities Inspection Fee  
15   Applies to Commercial Permits with on-site stormwater management facilities.  
16   Fees for inspecting construction of approved on-site permanent stormwater quality and quantity control facilities.  
18   Total Value of Construction Work to be Performed:  
19   $1 - $500 $15 $16
20   $501 - $2,000 $15 $16 for the first $500, plus $.50 $.53 for each
21     additional $100 or fraction thereof, to and
22     including $2,000.
23   $2,001 - $25,000 $22.50 $23.95 for the first $2,000, plus $1.00 $1.05
24     for each additional $1,000 or fraction thereof, to and
25     including $25,000.
26   $25,001 - $50,000 $45.50 $48.10 for the first $25,000, plus $.75 $.79
27     for each additional $1,000 or fraction thereof, to and
28     including $50,000.
29   $50,001 - $100,000 $64.25 $67.85 for the first $50,000, plus $.50 $.53
30     for each additional $1,000 or fraction thereof, to and
31     including $100,000.
32   $100,001 and up $89.25 $94.35 for the first $100,000, plus $.25 $.26
33     for each additional $1,000 or fraction thereof.
35   (This fee is consolidated in the Residential Fees.)  
40   APPLIES TO RESIDENTIAL PROJECTS:
41   Residential Fees  
42   Residential Site Inspection Fee for Simple Sites:  
43   This fee replaces separate fees charged for on-site stormwater plan review, erosion control, tree preservation,  
44   and stormwater facilities inspections. It applies to all simple residential sites with ground-disturbing activity.  
45   Services include inspections for landscaping, zoning, erosion control, and compliance with conditions of  
46   Land Use Reviews.  
48   New Construction $350
49   Additions, alterations, garages, and carports $150
51   (This is a consolidated site development fee formerly: erosion control fees, on-site permanent stormwater
52   control facilities / inspection fee, stormwater disposal plan check fee and tree preservation and planting
53   plan check and inspection fee)  
55   Residential Site Inspection Fee for Complex Sites:  
56   This fee replaces separate fees charged for on-site stormwater plan review, erosion control, tree preservation  
57   and stormwater facilities inspections. It applies to residential sites with ground-disturbing activity located in  
58   special sites, as defined in Title 10. Services include inspections for required landscaping, zoning,  
59   Environmental Zone standards, erosion control, and compliance with conditions of Land Use Reviews.  
61   New Construction $450
62   Additions, alterations, garages, and carports $225
64   (This is a consolidated site development fee formerly: erosion control fees, on-site permanent stormwater
65   control facilities / inspection fee, stormwater disposal plan check fee and tree preservation and planting
66   plan check and inspection fee)  
70   APPLIES TO COMMERCIAL and SITE DEVELOPMENT PROJECTS:
71   Erosion Control Permit Fees  
73   New Construction (construction of a new building) and  
74   clearing and grading permits.  
75   a. Single family or duplex (2 dwelling units including two townhouse or rowhouse units)
76   Located in an Environmental Zone $255
77   Located in any other zone $170
79   b. All other construction, clearing permits and grading  
80   permits.  
82   Commercial and Site Development Permits:  
83   Located in an Environmental Zone: Base fee (up to one acre) $255 $268
84     Plus, $43 $45 for each 0.5 acre (21,780 sq. ft.) of lot
85     area, or portion thereof, for lots over 1 acre (43,560 sq. ft.)
87   Located in any other zone: Base fee (up to one acre) $170 $179
88     Plus, $43 $45 for each 0.5 acre (21,780 sq. ft.) of lot
89     area, or portion thereof, for lots over 1 acre (43,560 sq. ft.)
91   Exterior Utility Lines (water, sanitary, storm, telephone, $15 $16 for the first 100 feet of line.
92   cable, electric) $10 $11 for each additional 100 feet of line, or portion thereof.
94   Exterior Remodels and Additions  
95   Located in an Environmental Zone: Base fee (up to one acre) $150 $158
96     Plus, $25 $26 for each 0.5 acre (21,780 sq. ft.) of ground
97     disturbance, or portion thereof, for projects disturbing
98     more than 1 acre (43,560 sq. ft.)
100   Located in any other zone: Base fee (up to one acre) $100 $105
101     Plus, $25 $26 for each 0.5 acre (21,780 sq. ft.) of ground
102     disturbance, or portion thereof, for projects disturbing
103     more than 1 acre (43,560 sq. ft.)
105     In no case does the fee for an addition or remodel of
106     a single-family or duplex lot need to exceed the fee for
107     new construction.
109   (This fee is consolidated in the Residential Fees.)  
112   APPLIES TO COMMERCIAL, RESIDENTIAL and SITE DEVELOPMENT PROJECTS:
113   Clearing Permit Fee  
114   For vegetation removal only with no other permitted activity.  
116   5,000 square feet to 1 acre $45 $47
117   Over 1 acre $45, $47 plus $10 $11 per additional acre or
118     fraction of an acre.
120   Clearing with Tree Cutting Permit Fee  
121   For vegetation removal only with no other permitted activity.  
122   (on slopes over 25% 10% gradient)  
123   2,500 square feet - Less than 1 acre $90 $95
124   1 acre and up $90 $95, plus $30 $32 per additional acre or
125     fraction of an acre.
127   Site Development Permit Fee  
128   Applies to site work when no building permit is issued, including grading, excavation, floodplain,  
129   private streets, landscaping, and on-site stormwater facilities. Site development permit fees use the standard building  
130   permit fee table based upon project valuation, plus a plan review fee of 65% of the site development permit fee.  
132   Total Value of Construction Work to be Performed:  
133   $1 - $500 $50 minimum fee
135   $501 - $2,000 $50 for the first $500, plus $2.25 for each
136     additional $100 or fraction thereof, to and
137     including $2,000
139   $2,001 - $25,000 $83.75 for the first $2,000, plus $8.82 for each
140     additional $1,000 or fraction thereof, to and
141     including $25,000
143   $25,001 - $50,000 $286.61 for the first $25,000, plus $6.56 for each
144     additional $1,000 or fraction thereof, to and
145     including $50,000
147   $50,001 - $100,000 $450.61 for the first $50,000, plus $4.37 for each
148     additional $1,000 or fraction thereof, to and
149     including $100,000
151   $100,001 and up $669.11 for the first $100,000, plus $3.68 for each
152     additional $1,000 or fraction thereof
154   Site Development Plan Review Fee  
155   For the original submittal and one revision, unless 65% of the site development permit fee
156   the revision increases the project valuation.  
159   APPLIES TO COMMERCIAL, RESIDENTIAL and SITE DEVELOPMENT PROJECTS:
160   Miscellaneous Fees  
161   Additional Plan Review Fee  
162   For changes, additions, or revisions to approved plans. Plan review time 1/2 hour or less: $55
163     Plan review time greater than 1/2 hour:
164   For technical plan review of special sites, including $105 per hour or fraction thereof
165   grading, geotech, engineered stormwater facilities,  
166   shoring, and private streets.  
168   Inspections Outside of Normal Business Hours $150 per hour or fraction of an hour
169     Minimum - $150
171   Investigation Fee  
172   For commencement of work before obtaining a permit Equal to the permit fee or the actual investigation
173     costs at $105 per hour, whichever is greater,
174     plus $250
176   Limited Site Development Consultation Fee $150 first hour, plus $105 per additional hour
177   For requested optional meeting or site visit held prior to or fraction of an hour
178   permit application. Applies to projects with complex site  
179   issues, including geotech, environmental zones, or Minimum - 1 hour
180   other special sites.  
182   The meeting will be limited to two City staff members.  
184   Permit Reinstatement Processing Fee  
185   Fee for renewal of a permit that has been expired for The renewal fee shall be one half the amount
186   six months or less provided no changes have been required for a new permit.
187   made in the original plans and specifications for such  
188   work. A permit may be renewed only once. Minimum Fee - $50
190   Reinspection Fee  
191   When another inspection is required to confirm $75 per inspection
192   corrections, when the site is not accessible for a  
193   requested inspection, or plans are not available  
194   on site as required.  
197   FEES TO BE DELETED:  
198   (This fee is consolidated in the Residential Fees.)  
199   Stormwater Disposal Plan Review $30 per plan
200   (This fee is consolidated in the Residential Fees.)  
201   Tree Preservation and Planting Plan Check and Inspection Fee  
202   Fee for checking plans and inspecting tree preservation and plantings required for new residential  
203   development. No fee is required when a developer has contributed to the Tree Fund in  
204   Section 33.248.020 H.2.c of the City Code.  
206   Total Value of Construction Work to be Performed:  
207   $1 - $500 $10
208   $501 - $2,000 $10 for the first $500, plus $.25 for each
209     additional $100 or fraction thereof, to and
210     including $2,000.
211   $2,001 - $25,000 $13.75 for the first $2,000, plus $.50 for each
212     additional $1,000 or fraction thereof, to and
213     including $25,000.
214   $25,001 - $50,000 $25.25 for the first $25,000, plus $.38 for each
215     additional $1,000 or fraction thereof, to and
216     including $50,000.
217   $50,001 - $100,000 $34.75 for the first $50,000, plus $.25 for each
218     additional $1,000 or fraction thereof, to and
219     including $100,000.
220   $100,001 and up $47.25 for the first $100,000, plus $.13 for each
221     additional $1,000 or fraction thereof.
223   Excavation and Grading Plan Check Fee  
224   Use this schedule for projects involving only grading and excavation. If there is also other work involved, the
225   plan check fee is 65% of the building permit fee.  
227   50 cubic yards or less $17
228   51 to 100 cubic yards $35
229   101 to 1,000 cubic yards $50
230   1,001 to 10,000 cubic yards $65
231   10,001 to 100,000 cubic yards $65 for first 10,000 cubic yards, plus $22 for
232     each additional 10,000 cubic yards or fraction
233   100,001 to 200,000 cubic yards $263 for first 100,000 cubic yards, plus $11 for
234     each additional 10,000 cubic yards or fraction
235   200,001 cubic yards or more $373 for first 200,000 cubic yards, plus $6 for
236     each additional 10,000 cubic yards or fraction
240   FEES TO BE DELETED:  
241   Grading Permit Fees  
242   Use this schedule for projects involving only grading and excavation. If there is also other work involved, use
243   the standard building permit fee table based on project valuation.
245   50 cubic yards or less $50
246   51 to 100 cubic yards $70
247   101 to 1,000 cubic yards $70 for first 100 cubic yards, plus $22 for
248     each additional 100 cubic yards or fraction
249   1,001 to 10,000 cubic yards $268 for first 1,000 cubic yards, plus $17 for
250     each additional 1,000 cubic yards or fraction
251   10,001 to 100,000 cubic yards $421 for first 10,000 cubic yards, plus $55 for
252     each additional 10,000 cubic yards or fraction
253   100,001 cubic yards or more $916 for first 100,000 cubic yards, plus $28 for
254     each additional 10,000 cubic yards or fraction
256   The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference
257   between the fee paid for the original permit and the fee shown for the entire project.
259   Pre-Permit Site Inspection for Properties in $150
260   Environmental Zones  
265   Printing: 70% normal size  
266   Column Width: 64  
267   Margins:  
268   Top: .75"  
269   Left: .75"  
270   Bottom: .5"  
271   Right: .75"  
272   Bottom Footer: .25"  

PROPOSED SITE DEV W-CROSSOUTS

  A B C
1   City of Portland
2   Office of Planning and Development Review
4   Site Development Permit Fee Schedule
5   Effective Date: November 15, 2002
13   APPLIES TO COMMERCIAL PROJECTS:
14   On-Site Permanent Stormwater Control Facilities Inspection Fee  
15   Applies to Commercial Permits with on-site stormwater management facilities.  
16   Fees for inspecting construction of approved on-site permanent stormwater quality and quantity control facilities.  
18   Total Value of Construction Work to be Performed:  
19   $1 - $500 $16
20   $501 - $2,000 $16 for the first $500, plus $.53 for each
21     additional $100 or fraction thereof, to and
22     including $2,000.
23   $2,001 - $25,000 $23.95 for the first $2,000, plus $1.05 for each
24     additional $1,000 or fraction thereof, to and
25     including $25,000.
26   $25,001 - $50,000 $48.10 for the first $25,000, plus $.79 for each
27     additional $1,000 or fraction thereof, to and
28     including $50,000.
29   $50,001 - $100,000 $67.85 for the first $50,000, plus $.53 for each
30     additional $1,000 or fraction thereof, to and
31     including $100,000.
32   $100,001 and up $94.35 for the first $100,000, plus $.26 for each
33     additional $1,000 or fraction thereof.
39   APPLIES TO RESIDENTIAL PROJECTS:
40   Residential Fees  
41   Residential Site Inspection Fee for Simple Sites:  
42   Applies to all simple residential sites with ground-disturbing activity. Services include inspections for landscaping,  
43   zoning, erosion control, and compliance with conditions of Land Use Reviews.  
45   New Construction $350
46   Additions, alterations, garages, and carports $150
49   Residential Site Inspection Fee for Complex Sites:  
50   Applies to residential sites with ground-disturbing activity located in special sites, as defined in Title 10.  
51   Services include inspections for required landscaping, zoning, Environmental Zone standards, erosion control, and  
52   compliance with conditions of Land Use Reviews.  
54   New Construction $450
55   Additions, alterations, garages, and carports $225
59   APPLIES TO COMMERCIAL and SITE DEVELOPMENT PROJECTS:
60   Erosion Control Fees  
62   Commercial and Site Development Permits:  
63   Located in an Environmental Zone: Base fee (up to one acre) $268
64     Plus, $45 for each 0.5 acre (21,780 sq. ft.) of lot
65     area, or portion thereof, for lots over 1 acre (43,560 sq. ft.)
67   Located in any other zone: Base fee (up to one acre) $179
68     Plus, $45 for each 0.5 acre (21,780 sq. ft.) of lot
69     area, or portion thereof, for lots over 1 acre (43,560 sq. ft.)
71   Exterior Utility Lines (water, sanitary, storm, telephone, $16 for the first 100 feet of line.
72   cable, electric) $11 for each additional 100 feet of line, or portion thereof.
74   Exterior Remodels and Additions  
75   Located in an Environmental Zone: Base fee (up to one acre) $158
76     Plus, $26 for each 0.5 acre (21,780 sq. ft.) of ground
77     disturbance, or portion thereof, for projects disturbing
78     more than 1 acre (43,560 sq. ft.)
80   Located in any other zone: Base fee (up to one acre) $105
81     Plus, $26 for each 0.5 acre (21,780 sq. ft.) of ground
82     disturbance, or portion thereof, for projects disturbing
83     more than 1 acre (43,560 sq. ft.)
87   APPLIES TO COMMERCIAL, RESIDENTIAL AND SITE DEVELOPMENT PROJECTS:
88   Clearing Fee  
89   For vegetation removal only with no other permitted activity.  
91   5,000 square feet to 1 acre $47
92   Over 1 acre $47, plus $11 per additional acre or fraction of an acre.
94   Clearing with Tree Cutting Fee  
95   For vegetation removal only with no other permitted activity.  
96   (on slopes over 10% gradient)  
97   2,500 square feet - 1 acre $95
98   1 acre and up $95, plus $32 per additional acre or fraction of an acre.
100   Site Development Permit Fee  
101   Applies to site work when no building permit is issued, including grading, excavation, floodplain,  
102   private streets, landscaping, and on-site stormwater facilities. Site development permit fees use the standard building  
103   permit fee table based upon project valuation, plus a plan review fee of 65% of the site development permit fee.  
105   Total Value of Construction Work to be Performed:  
106   $1 - $500 $50 minimum fee
108   $501 - $2,000 $50 for the first $500, plus $2.25 for each
109     additional $100 or fraction thereof, to and
110     including $2,000
112   $2,001 - $25,000 $83.75 for the first $2,000, plus $8.82 for each
113     additional $1,000 or fraction thereof, to and
114     including $25,000
116   $25,001 - $50,000 $286.61 for the first $25,000, plus $6.56 for each
117     additional $1,000 or fraction thereof, to and
118     including $50,000
120   $50,001 - $100,000 $450.61 for the first $50,000, plus $4.37 for each
121     additional $1,000 or fraction thereof, to and
122     including $100,000
124   $100,001 and up $669.11 for the first $100,000, plus $3.68 for each
125     additional $1,000 or fraction thereof
127   Site Development Plan Review Fee  
128   For the original submittal and one revision, unless 65% of the site development permit fee
129   the revision increases the project valuation.  
133   APPLIES TO COMMERCIAL, RESIDENTIAL and SITE DEVELOPMENT PROJECTS:  
134   Miscellaneous Fees  
135   Additional Plan Review Fee  
136   For changes, additions, or revisions to approved plans. Plan review time 1/2 hour or less: $55
137     Plan review time greater than 1/2 hour:
138   For technical plan review of special sites, including $105 per hour or fraction thereof
139   grading, geotech, engineered stormwater facilities,  
140   shoring, and private streets.  
142   Inspections Outside of Normal Business Hours $150 per hour or fraction of an hour
143     Minimum - $150
145   Investigation Fee  
146   For commencement of work before obtaining a permit Equal to the permit fee or the actual investigation
147     costs at $105 per hour, whichever is greater,
148     plus $250
150   Limited Site Development Consultation Fee $150 first hour, plus $105 per additional hour
151   For requested optional meeting or site visit held prior to or fraction of an hour
152   permit application. Applies to projects with complex site  
153   issues, including geotech, environmental zones, or Minimum - 1 hour
154   other special sites.  
156   The meeting will be limited to two City staff members.  
158   Permit Reinstatement Processing Fee  
159   Fee for renewal of a permit that has been expired for The renewal fee shall be one half the amount
160   six months or less provided no changes have been required for a new permit.
161   made in the original plans and specifications for such  
162   work. A permit may be renewed only once. Minimum Fee - $50
164   Reinspection Fee  
165   When another inspection is required to confirm $75 per inspection
166   corrections, when the site is not accessible for a  
167   requested inspection, or plans are not available  
168   on site as required.  
173   Printing: 70% normal size  
174   Column Width: 64  
175   Margins:  
176   Top: .75"
177   Left: .75"  
178   Bottom: .75"  
179   Right: .75"  
180   Bottom Footer: .5"  

FINAL SITE DEV FEE SCHEDULE