A |
B |
C |
D |
E |
F |
---|
1 |
Final Estimate |
3 |
STATEMENT of the various kinds of work performed in the improvement
of |
5 |
Boise/Earl Boyles Park LID |
7 |
in accordance with the provisions of Ordinance No. 175927 |
8 |
CONTRACTOR: Parker Northwest Paving Company |
9 |
10 |
11 |
|
|
|
|
TOTAL |
TOTAL |
12 |
NO. |
ITEMS OF WORK AND MATERIALS |
UNIT |
UNIT PRICE |
QUANTITY |
AMOUNT |
14 |
1 |
Mobilization |
ls |
$21,856.00 |
0.13 |
$2,840.92 |
15 |
2 |
Temporary Protection & Direction of Traffic |
ls |
$1,000.00 |
0.13 |
$130.00 |
16 |
3 |
Temporary Signs |
m2 |
$60.00 |
0.00 |
$- |
17 |
4 |
Temporary Barricades |
ea |
$110.00 |
0.00 |
$- |
18 |
5 |
Temporary Erosion Control |
ls |
$1,000.00 |
0.21 |
$208.01 |
19 |
6 |
Inlet Protection |
ea |
$50.00 |
0.00 |
$- |
20 |
7 |
Gravel Construction Entrances |
ea |
$300.00 |
1.00 |
$300.00 |
21 |
8 |
Removal of Structures & Obtructions |
ls |
$1.00 |
0.00 |
$- |
22 |
9 |
Removal of Curbs |
m |
$3.30 |
8.00 |
$26.40 |
23 |
10 |
Removal of Walks and Driveways |
m2 |
$50.00 |
2.00 |
$100.00 |
24 |
11 |
Removal of Sound Wall (Bid Only) |
ls |
$100.00 |
0.00 |
$- |
25 |
12 |
Clearing and Grubbing |
ls |
$18,400.00 |
0.27 |
$5,029.77 |
26 |
13 |
Contingent Tree Removal, 0 mm - 200 mm |
ea |
$50.00 |
0.00 |
$- |
27 |
14 |
Contingent Tree Removal, 200 mm - 510 mm |
ea |
$100.00 |
0.00 |
$- |
28 |
15 |
Contingent Tree Removal, Over 510 mm |
ea |
$200.00 |
0.00 |
$- |
29 |
16 |
Exploratory Tree Root Excavation |
hr |
$15.00 |
0.00 |
$- |
30 |
17 |
General Excavation |
m3 |
$12.09 |
377.63 |
$4,565.55 |
31 |
18 |
300 mm Subgrade Stabilization |
m2 |
$2.93 |
205.40 |
$601.82 |
32 |
19 |
Subgrade Geotextile |
m2 |
$0.60 |
677.00 |
$406.20 |
33 |
20 |
75 mm Drain Pipe |
m |
$20.00 |
0.00 |
$- |
34 |
21 |
300 mm Inlet Lead Pipe - Complete |
m |
$150.00 |
2.60 |
$390.00 |
35 |
22 |
Concrete Inlets Type CG-2 |
ea |
$650.00 |
1.00 |
$650.00 |
36 |
23 |
Concrete Inlets Type G-2 |
ea |
$650.00 |
0.00 |
$- |
37 |
24 |
Drainage Curbs, Concrete |
m |
$12.30 |
0.00 |
$- |
38 |
25 |
Drainage Curbs, Asphalt |
m |
$12.30 |
0.00 |
$- |
39 |
26 |
Adjusting Manholes |
ea |
$150.00 |
0.00 |
$- |
40 |
27 |
Reconstructing Manholes |
ea |
$750.00 |
1.00 |
$750.00 |
41 |
28 |
Aggregate Base, 200 mm Thick |
m2 |
$5.86 |
632.00 |
$3,703.52 |
42 |
29 |
Standard Duty Class "B" Asphalt Concrete |
m2 |
$3.58 |
785.00 |
$2,810.30 |
43 |
30 |
Standard Duty Class "C" Asphalt Concrete |
m2 |
$3.58 |
875.00 |
$3,132.50 |
44 |
31 |
Asphalt Driveway Connection |
m2 |
$18.00 |
24.60 |
$442.80 |
45 |
32 |
Asphalt Walks |
m2 |
$20.00 |
29.85 |
$597.00 |
46 |
33 |
Concrete Walks |
m2 |
$25.09 |
265.50 |
$6,661.40 |
47 |
34 |
Concrete Driveways |
m2 |
$36.15 |
52.50 |
$1,897.88 |
48 |
35 |
Concrete Driveway Connection |
m2 |
$36.15 |
0.00 |
$- |
49 |
36 |
Concrete Curb Type C |
m |
$23.60 |
96.00 |
$2,265.60 |
50 |
37 |
Concrete Curb Type A |
m |
$32.80 |
96.92 |
$3,178.98 |
51 |
38 |
Remove & Re-install Existing Signs |
ea |
$75.00 |
0.00 |
$- |
52 |
39 |
Pipe Sign Post |
ea |
$50.00 |
0.00 |
$- |
53 |
40 |
Topsoil |
m3 |
$29.50 |
37.50 |
$1,106.25 |
54 |
41 |
Seeded Lawn |
m2 |
$0.55 |
0.00 |
$- |